Similar Projects
Radley Management
New Construction - 47,079 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Falls Church, VA 22041

Auto Renewal Services
New Construction - 1,995 SF
Conception
Hampton, VA 23666

Scotts Ivy Exxon Auto Store
New Construction, Addition - 3,200 SF
Design
$750,000 est. value
Charlottesville, VA 22903

Take 5 Oil Change
New Construction - 1,430 SF
Design
Yorktown, VA 23692

Wawa #8690 / Charlottesville
New Construction, Infrastructure - 5,279 SF
Bidding
$2,000,000 CJ est. value
Charlottesville, VA 22902

AutoZone #6501 / Vinton
Renovation - 7,000 SF
Bidding
$300,000 CJ est. value
Vinton, VA 24179

Buc-ee's Travel Center #VA1 - New Building / Rockingham County
Addition, Demolition, New Construction, Infrastructure - 74,000 SF
Sub-Bidding
$20,000,000 CJ est. value
Mount Crawford, VA 22841

Truck Enterprises Buildings Package
New Construction, Infrastructure - 78,000 SF
Sub-Bidding
$25,000,000 CJ est. value
Ashland, VA 23005

Sheehy Subaru / Springfield
New Construction, Infrastructure
Post-Bid
$30,000,000 CJ est. value
Springfield, VA 22150

Royal Farms #471 / Norfolk
New Construction, Infrastructure - 5,200 SF
Post-Bid
$1,400,000 CJ est. value
Norfolk, VA 23518

Kingstowne Consolidated Facility
New Construction, Infrastructure - 90,000 SF
Results
$63,649,000 CJ est. value
Alexandria, VA 22315

Field Operations Fueling Facility
Renovation, Infrastructure
Results
$886,500 CJ est. value
Roanoke, VA 24012

Bayside Ford
New Construction - 39,800 SF
Construction
$5,000,000 to $10,000,000 CJ est. value
King George, VA 22485

Valvoline Oil Change
New Construction - 3,763 SF
Construction
$500,000 to $1,000,000 CJ est. value
Midlothian, VA 23112

Amigos Commercial Truck & Auto Repair
New Construction
Pending Verification
Petersburg, VA 23803

Last Updated 02/15/2024 02:21 PM
Project Title

AutoZone #1659 / Harrisonburg

Physical Address View project details and contacts
City, State (County) Harrisonburg, VA 22801   (Harrisonburg City County)
Category(s) Commercial
Sub-Category(s) Vehicle Sales/Service
Contracting Method Bids by Invitation
Project Status Bidding, Construction start expected April 2024
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from Owner
Owner View project details and contacts
Architect View project details and contacts
Description

This project is in the final planning phase. Bidding is expected in February 2024.* *Absolutely no inquiries will be accepted at this time. Unsolicited inquiries may result in disqualification in any future bidding opportunities. *The Editorial Content team has obtained construction timeline information, complete bid list and construction documents directly from AutoZone.

Details

1 Story Above Grade, 12,474 SF.
Division 01 - General Requirements, Construction Facilities, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Cast-in-Place Concrete, Concrete Finishing.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Frames, Metal Doors, Specialty Doors and Frames, Coiling Doors and Grilles, Overhead Coiling Doors, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Plaster and Gypsum Board Assemblies, Supports for Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Resilient Flooring, Carpeting, Acoustic Treatment, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Vehicle Service Equipment, Compressed-Air Vehicle Service Equipment, Vehicle Lubrication Equipment, Tire-Changing Equipment, Vehicle-Washing Equipment.
Division 12 - Furnishings, Office Accessories, Rugs and Mats, Office Furniture, Interior Planters and Artificial Plants.
Division 14 - Conveying Equipment, Vehicle Lifts.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Eyewash Equipment, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central Heating Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Security Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Voice Communications Messaging.
Division 28 - Electronic Safety and Security, Intrusion Detection, Electronic Surveillance, Fire Detection and Alarm, Fuel-Oil Detection and Alarm.
Division 31 - Earthwork, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Parking Bumpers, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities, Common Work Results for Utilities, Water Utilities, Sanitary Sewerage Utilities.
Division 41 - Material Processing and Handling Equipment, Cranes and Hoists.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents