Similar Projects
Furnishing and Delivery of Center Flow Screening Systems
Bidding
Cape May Court House, NJ 08210

Corrosion Control Treatment System-Phase II
Bidding
Trenton, NJ 08608

Water and Sewer Plant Supplies, Such as Repair Clamps, Pipe, Valves, Miscellaneous Fittings, Etc.
Post-Bid
Little Egg Harbor, NJ 08087

Arsenic Treatment Facilities - Arsenic Adsorption Cartridges
Post-Bid
Ramsey, NJ 07446

Operation and Maintenance of Wastewater Treatment Plant and Potable Water Treatment Plants
Results
Trenton, NJ

WWTP Improvements Project
Results
Vineland, NJ

Storm Control Treatment Facility Construction Project
New Construction
Construction
Bridgewater, NJ 08807

Tyson Foods Wastewater Treatment Plant
New Construction
Pending Verification
Vineland, NJ 08360

Water Filtration Plant Aerator Replacement
Bidding
Willingboro, NJ 08046

Albert E. Clifton Ave. Water Treatment Plant Pressure Filter Replacement
Post-Bid
Point Pleasant, NJ 08742

Y--561A4-13-108 Modernize Waste Water New Jersey VA Health Care System Lyons Campus
Results
$1,000,000 to $5,000,000 est. value
Lyons, NJ 07939

Catapult Waste Water Treatment Sys Maintenance
Post-Bid
Trenton, NJ 08641

Hartford Road Water Treatment Plant Upgrade
Results
$9,700,000 to $12,300,000 est. value
Moorestown, NJ 08057

River Road Wastewater Treatment Plant (WWTP) Clarifier Improvements Project
Post-Bid
$120,000 est. value
Princeton, NJ 08540

North Church Street Water Treatment Plant Upgrades
Results
$15,400,000 to $18,975 est. value
Moorestown, NJ 08057

Last Updated 01/03/2019 09:51 AM
Project Title

WWTP ODOR Control Scrubber Upgrade

Physical Address View project details and contacts
City, State (County) Burlington, NJ 08016   (Burlington County)
Category(s) Sewer and Water
Sub-Category(s) Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Work includes the furnishing of all labor, material, and equipment necessary to remove the existing Odor Control Scrubber and install one new Odor Control Scrubber with interconnecting piping, FRP duct work, and electrical work at the Burlington City Wastewater Treatment Plant.
Details
Division 02 - Existing Conditions, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Lifts.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents