Similar Projects
Greenfield Community Crossings Matching Grant
Infrastructure
Bidding
$1,511,677 CJ est. value
Greenfield, IN 46140

Reconstruction of Bridge 170 carrying County Road 900 South over Shoemaker/Thomas Ditch
Renovation
Bidding
$910,000 CJ est. value
Bluffton, IN 46714

2023 CCMG R1 Resurfacing & Crack Sealing
Infrastructure
Sub-Bidding
$80,000 CJ est. value
Versailles, IN 47042

North Triangle Neighborhood Concrete Street Repairs
Infrastructure
Sub-Bidding
$579,000 CJ est. value
Fort Wayne, IN 46802

Stone Materials
Infrastructure, Alteration
Post-Bid
Schererville, IN

Ivy Tech Community College Indy C4 Exterior Concrete Stair Project
Renovation, Alteration
Post-Bid
$110,000 est. value
Indianapolis, IN 46208

Hudnut Commons Garage Concrete Repairs
Alteration
Results
Indianapolis, IN 46213

Jasper Campus Miscellaneous Concrete Work
Alteration
Results
Jasper, IN 47546

South Newton High School Baseball and Weight Room Renovation Projects
Renovation
Bidding
$200,000 CJ est. value
Kentland, IN 47951

Bridge Replacement and Small Structure Replacement
Demolition, New Construction, Infrastructure
Post-Bid
$7,986,732 CJ est. value
Rochester, IN 46975

2022 Miscellaneous Concrete Package
Alteration
Results
Fort Wayne, IN

Buckeye Street and Clearwell Water Utility Improvements
Infrastructure
Bidding
$300,000 CJ est. value
Osgood, IN 47037

Rushville Fire Department Addition and Renovation
Addition, Demolition, Renovation, Infrastructure - 5,137 SF
Post-Bid
$1,000,000 CJ est. value
Rushville, IN 46173

Arlington Park Concrete Street Repairs Phase 3
Infrastructure, Alteration
Results
Fort Wayne, IN

Upgrade Clean Rooms Phase 4
Renovation
Post-Bid
$100,000 CJ est. value
Indianapolis, IN 46202

Last Updated 06/12/2023 03:06 PM
Project Title

Whitney Young Early Childhood Center Office, Media center and Pre-K Classroom Renovations

Physical Address View project details and contacts
City, State (County) Fort Wayne, IN 46803   (Allen County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $650,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

As of November 29, 2022, the project has been awarded. A timeline for construction has not been confirmed. Each bid shall be accompanied by a certified check, a cashier's check or a bid bond executed by a surety company which is authorized to do business in the State of Indiana, made payable to the Fort Wayne Community Schools and in an amount equal to five percent (5%) of the bid. In the event a bidder withdraws its bid or fails to execute a satisfactory contract within ten (10) days after the contract is awarded to such bidder by Fort Wayne Community Schools, Fort Wayne Community Schools may declare the certified check, cashier s check or bid bond forfeited to Fort Wayne Community Schools, as liquidated damages. A bid may not be modified, withdrawn or cancelled by the bidder for sixty (60) days following the time and date designated for the receipt of bids without the consent of Fort Wayne Community Schools. Fort Wayne Community Schools reserves the right to reject any and all bids or waive any or all informalities, irregularities and/or inconsistencies in, or with respect to, any or all bids Fort wayne community schools reserves the right to assign all or any portion of any bid and or contract to any non profit building corporation controlled by fort wayne community s schools without the consent of any other party, and any employee of Fort Wayne Community Schools may be designated by Fort Wayne Community Schools and/or any such nonBprofit building corporation to serve as the authorized agent or representative of such nonHprofit building corporation with respect to any such bid or contract All contracts awarded in connection with these projects and all obligations of payment by Fort Wayne Community Schools or any nonSprofit building corporation controlled by Fort Wayne Community Schools shall be condtioned upon and subject to obtaining financing or other funds sufficient to pay all of the amounts set forth in such contract. All awarded contracts will be subject to termination, without penalty or liability, at the option of Fort Wayne Community Schools or any such nonSprofit buirding corporation at any time after execution of such contract in the event Fort Wayne Community Schools determines that funds will not be sufficient to pay all of the amounts set forth in such contract. Performance and Labor and Material Payment Bonds in an amount equal to one hundred percent (100%) of the contract amount shall be required to be provided by the successful bidder to Fort Wayne Community Schools or its assignee no later than ten (10) days after the execution of such contract. Such bonds shall remain in full force and effect for a period of twelve (12) months after the date of Substantial Completion. *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information.

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents