Similar Projects
Z--Mechanical, Electrical and Plumbing (MEP) Multiple Award Construction Contract
Design
$150,000 to $10,000,000 est. value

Replacement of 2 Boilers at John G. Prendergast School
Bidding
$200,000 to $300,000 est. value
Ansonia, CT 06401

J044--West Haven and Newington CT Boiler Plant Service and Maintenance
Bidding
New Haven, Newington, West Haven, CT 06516

Walk-In Freezer, Cooler & Generator
Post-Bid
Waterbury, CT 06705

Furnace and Domestic Hot Water Replacement at McConaughy Terrace
Post-Bid
New Haven, CT

Cooling and Boiler Water Treatment Services
Term Contract
Results
New Haven, CT 06515

Miscellaneous Electrical and Mechanical Repairs and Improvements at Temple Street Parking Garage and Temple Medical Garage
Results
New Haven, CT

Chemical Water Treatment
Bidding
Waterbury, CT

Energy Center Boiler Maintenance
Term Contract
Post-Bid
New Haven, CT 06515

Oil Fired Boiler Replacement With Indirect
Results
$8,222 est. value
East Haven, CT

Boiler Replacements
Post-Bid
Waterbury, CT 06702

Replace Danfoss 3-Way Valve Boiler City Hall
Results
Waterbury, CT 06702

WPC Boiler Replacement in the Collection Building
Post-Bid
Waterbury, CT 06708

Water Department Boiler Replacement
Results
Meriden, CT 06450

2020 Home Energy Solutions-Income Eligible Heat Pump Water Heater
Post-Bid
Orange, CT 06477

Last Updated 05/28/2019 10:09 AM
Project Title

Boiler Cleaning

Physical Address View project details and contacts
City, State (County) Wallingford, CT   (New Haven County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description Contract Period: 7/1/19 Thru 6/30/22. Goals: 25% of the work with DAS certified Small and Minority owned businesses and 25% of that work with DAS certified Minority, Women and/or Disabled owned businesses. The contractor must demonstrate good faith effort to meet the 25% set-aside goals.
Details
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Heating Boilers.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents