Similar Projects
RFP D/B - Jail Elevator Modernization
Renovation
Bidding
$300,000 CJ est. value
Greeley, CO 80631

RFP D/B - Bradley & Holm MEP
Renovation
Bidding
$1,800,000 CJ est. value
Denver, CO 80202

Hot Mix Asphalt Supply
Term Contract
Sub-Bidding
Golden, CO 80401

2023 Concrete Flatwork
Infrastructure
Sub-Bidding
$400,000 CJ est. value
Commerce City, CO 80022

Concrete Contractors for Pouring Concrete Slabs at the Alamosa K-2 Elementary School
Post-Bid
Alamosa, CO 81101

Construct Vehicle Storage for High-Altitude Army Aviation Training Site (HAATS)
New Construction, Infrastructure - 6,191 SF
Post-Bid
$1,700,000 CJ est. value
Gypsum, CO 81637

NCCWTP Concrete Repairs
Results
$100,000 to $130,000 est. value
Denver, CO

Pagosa Springs Brine Building Concrete Work
Renovation
Results
$125,000 est. value
Pagosa Springs, CO 81147

2023 Paving Program
Infrastructure
Construction
$760,000 CJ est. value
Firestone, CO 80520

Rectangular Rapid Flashing Beacons in Lone Tree
Infrastructure
Bidding
$393,440 CJ est. value
Lone Tree, CO 80124

Boettcher Concert Hall Audio System Integration
Renovation
Sub-Bidding
$400,000 CJ est. value
Denver, CO 80202

All Division Concrete
Alteration
Post-Bid
Less than $100,000 est. value
Colorado Springs, CO

Operations On-Call Concrete Replacement and Repair
Alteration
Results
Lafayette, CO

Mesa Road and 30th Street Improvements Project
Infrastructure
Bidding
$499,000 CJ est. value
Colorado Springs, CO 80904

Precast Concrete Vaults
Term Contract
Sub-Bidding
Pueblo West, CO 81007

Last Updated 04/18/2023 03:32 AM
Project Title

RFP - D/B - Neighborhood Parks Design/Construction and Dry Creek Field Replacement

Physical Address View project details and contacts
City, State (County) Longmont, CO 80503   (Boulder County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected August 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $700,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Reference Number 0000315051 Question Acceptance Deadline 04/06/2023 07:00 PM EDT Questions are submitted online Yes The City of Longmont desires to contract with a team that will provide design/construction services for the Fox Meadows Neighborhood Park site, Clover Meadows Park site, and replacement of the existing turf fields with new synthetic fields at Dry Creek Community Park. The City intends to award all three projects to a single entity. The design process for this site must include an inclusive public process to engage the Longmont community to determine park needs and desires. The D/B team will respond based on the D/B team's recommended process to gain input from the public on what will be included in the park and within the budget. A publicly approved master plan produced through the public process will be presented to the Parks and Recreation Advisory Board (PRAB) and City Council for approval. o Full design of the park based on the approved master plan, including: o The "Fox Meadows" park name is a working name. The official park name will be determined through a public process based on Section 13.20.030 of the Longmont Municipal Code (LMC). o The coordination, design and construction of a raw water transmission line between the existing pond west of the site in the Fox Hills Country Club (FHCC). A previous agreement was completed between the FHCC, the St Vrain Valley School District (SVVSD) and the City to allow for the diversion of raw water from this source. Design and construction of a pump station at that location to irrigate the park parcel and the adjacent SVVSD parcel will be competed with this project work. The FHCC and the SVVSD are aware of the participation. o The plan must include the extension of the raw water transmission line from the FHCC to the park and SVVSD parcels through two exiting Fox Meadows neighborhood outlots. There is an existing blanket utility, access and drainage easement on the outlots. o Evaluation and coordination of the impacts of the park construction on the detention pond capacity of the park location, as the majority of the park is included in a detention pond designed with the Fox Meadows subdivision Question Deadline 04/06/2023 at 5:00 PM MT Questions are submitted online , information / clarification shall be submitted in writing by email. Valerie Scott Purchasing and Contracts Manager Phone: 303-774-4887 Email: valerie.scott@longmontcolorado.gov

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents