Similar Projects
SR 1001 over Tributary to Susquehanna River
Demolition, New Construction, Infrastructure
Conception
$675,000 CJ est. value
Scott, PA 17815

US 22/322 PM
Infrastructure
Conception
$2,850,000 CJ est. value
West Hanover, PA 17112

Southwest of Euclid Bridge
Demolition, New Construction, Infrastructure
Design
$1,961,171 CJ est. value
Franklin Township, PA 16001

SR 1003 - Brady Twp Line to SR 1001
Infrastructure
Design
$2,899,132 CJ est. value
Henderson Township, PA 16652

Briar Creek Boro to Berwick Boro line
Infrastructure
Bidding
$2,500,000 CJ est. value
Main Township, PA 17815

Allegheny Ave to Lakewood Ave
Infrastructure
Bidding
$1,000,000 CJ est. value
Millville, PA 17846

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Laubach Drive Steam Line Replacement
Infrastructure, Alteration
Post-Bid
Bloomsburg, PA 17815

Raising of Dwellings
New Construction, Infrastructure
Results
$450,000 CJ est. value
Bloomsburg, PA 17815

Renovations and Addition to Columbia Montour Area Vocation Technical School
Addition, Demolition, Renovation, Infrastructure
Results
$10,140,385 CJ est. value
Bloomsburg, PA 17815

SR 487 over Abandoned RR
Infrastructure
Conception
$2,210,000 CJ est. value
Scott, PA 17815

Alleghenyville Road (SR 3024) over I-176
Infrastructure
Design
$4,171,810 CJ est. value
Brecknock Township, PA 19540

Yost Hollow Road Culvert Replacement Project
Infrastructure
Bidding
$500,000 CJ est. value
Briar Creek Township, PA 18603

Paving Contract
Infrastructure
Post-Bid
$200,000 CJ est. value
Catawissa, PA 17820

Distillery Hill Water Storage Tank Project
Infrastructure
Results
$36,291 CJ est. value
Benton, PA 17814

Last Updated 03/27/2023 11:09 AM
Project Title

Honeysuckle Lane Stormwater Mitigation Project

Physical Address View project details and contacts
City, State (County) Bloomsburg, PA 17815   (Columbia County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Request for Qualifications, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $60,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Town of Bloomsburg is proposing to construct a stream bed with natural grade control structures to prevent erosion in the future. The project will include plunge pool outlets and proper erosion aprons to control erosion and flow. A certified check or bank draft payable to the order of LIVIC Civil, or a satisfactory Bid Bond executed by the Bidder and an acceptable surety in an amount equal to ten percent (10%) of the total of the Bid, shall be submitted with each bid. The Bidder shall include the fully completed Non-Collusion Affidavit with the bid. In addition to the Equal Employment requirements of Executive Order 11246 regarding discrimination, the CONTRACTOR must establish a 6.9% goal for female participation and a 1% goal for minority participation in his/her aggregate on-site construction workforce for contracts in excess of $10,000. The Town of Bloomsburg is utilizing federal funds for this project, and the Town has adopted a Minority and Women Business Enterprise (MBE/WBE) plan in accordance with Executive Orders 11625, 12138, and 12432 and a Section 3 Action Plan in accordance with Title 24 Part 75 Code of Federal Regulations. As such, the bidders/offerors must submit documentary evidence of minority and women business enterprises and Section 3 business concerns who have been contacted and to whom commitments have been made. Documentation of such solicitations and commitments shall be submitted with the bid. Moreover, the CONTRACTOR shall strive to meet the MBE goal of 5% and the WBE goal of 3% for contracts of $25,000 or more. For projects which the amount of HUD or CDBG funding exceeds $200,000 the CONTRACTOR must attempt to meet the minimum numerical goals of which 25% or more of the total number of labor hours worked by all workers on a Section 3 project are Section 3 workers, per 24 CFR Part 75.19; and 5% or more of the total number of labor hours worked by all workers on a Section 3 project are Targeted Section 3 workers, as defined in 24 CFR Part 75.21. The Town of Bloomsburg, in accordance with its Section 3 Action Plan, may provide a bid preference to a bidder who is a Section 3 business concern. MBE/WBE and Section 3 business concerns shall be afforded full opportunity to bid without discrimination. Davis-Bacon and Related Acts apply to this Project. Bids may be held by the Town of Bloomsburg for up to 60 days from the date of opening for the purpose of reviewing the bids and investigating the qualifications of bidders prior to awarding the contract. The Town of Bloomsburg reserves the right to reject any or all bids, to waive any irregularities, or to negotiate contract amounts.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents