Similar Projects
New Southern Illinois University Campus - Southern Illinois University School of Medicine
New Construction, Infrastructure
Conception
$50,000,000 CJ est. value
Springfield, IL 62703

Advocate Outpatient Center / Hoffman Estates
New Construction, Infrastructure
Conception
$20,000,000 CJ est. value
Springfield, IL 62707

Central Computing Facility
New Construction
Design
Less than $80,500,000 est. value
Springfield, IL

Kiwanis Park Improvements
Infrastructure
Design
$800,000 CJ est. value
Springfield, IL 62703

183 CES Vehicle Barrier Repairs
Infrastructure
Bidding
$250,000 CJ est. value
Springfield, IL 62707

Northeast Pilot Area Sanitary Sewer System Improvements
Infrastructure
Bidding
$100,000 CJ est. value
Springfield, IL 62703

HMA Resurfacing, Gutter and Storm Sewer Rehab
Infrastructure
Post-Bid
$400,000 CJ est. value
Rochester, IL 62563

Pavement Patching
Infrastructure
Post-Bid
$300,000 CJ est. value
Lockport, IL 60441

Mid-West Regional Construction IDIQ MATOC
Results
$50,000 to $80,000,000 est. value

SB Fuels Multiple Award Task Order Contract (MATOC)
Results
Less than $349,000,000 est. value
Washington, DC

New Berlin - Junior / Senior High School Remodel - Early Bid Package
Addition, Demolition, Infrastructure, Build-out
Construction
$23,500,000 CJ est. value
New Berlin, IL 62670

Lincoln Land Energy Center / Pawnee
New Construction, Infrastructure
Pending Verification
$1,000,000,000 CJ est. value
Pawnee, IL 62558

Navigator CO2 Ventures Midwest Carbon Capture Sequestration
Infrastructure
Pending Verification
$2,000,000,000 CJ est. value
Chatham, IL 62629

Gietl Park Redevelopment - Springfield Park District
Demolition, New Construction, Infrastructure
Conception
$800,000 CJ est. value
Springfield, IL 62703

Camp Butler Road Repairs and Correct IT Deficiencies
Infrastructure
Design
$5,000,000 CJ est. value
Springfield, IL 62707

Last Updated 08/18/2023 09:30 AM
Project Title

State Armory / Phase 3 Preservation

Physical Address View project details and contacts
City, State (County) Springfield, IL 62701   (Sangamon County)
Category(s) Government/Public, Heavy and Highway
Sub-Category(s) Misc. Buildings, Site Development
Contracting Method Bids by Invitation
Project Status Abandoned, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

As of August 16, 2023, bids were canceled. No definite date for the rebid. Phase 3 requires the documentation, cataloguing, dismantlement, removal, restoration and reinstallation of designated items and finishes. Included are wood paneling and trim in three suites, designated interior and exterior light fixtures, handrails, auditorium seating, wall plaques. and an exterior vault alarm. Designated items are to be removed concurrent with Phase 1 Stabilization under a separate contract, which includes abatement of ACM, lead and mold contaminates; Phase 3 Preservation contractor will be responsible to develop and maintain stringent safety precautions.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents