Similar Projects
Pump Station Duct Cleaning and Repairs
Bidding
Less than $397,500 est. value
Hingham, MA 02043

Generator and Transfer Switch Maintenance and Repair
Bidding
Less than $20,000 est. value
Marshfield, MA 02050

Utility Monitoring and Control Systems
Post-Bid
Less than $2,100,000,000 est. value

Installation of a Vehicle Exhaust Extraction System
Post-Bid
Less than $30,000 est. value
Middleborough, MA 02346

Repair and Selective Replacement of Structural Components Associated with the Bernie King Pavilion - Filed Sub Bids
Results
$450,000 est. value
Hull, MA

Advanced Contract Initiative (ACI) Temporary Emergency Power (TEMP)
Results

Ring Road Solar
Pending Verification
Kingston, MA 02364

Pump Station Replacement of Generators at Nanumett Street Old Salts Works Road and Terry Lane
Post-Bid
Wareham, MA

Historical Building A/C at the Hanover Town Hall
Results
Less than $290,000 est. value
Hanover, MA 02339

Marshfield Exterior Trim and Interior Repairs
Post-Bid
Less than $13,000 est. value
Marshfield, MA

On-Call Electrician Services
Term Contract
Results
$50,000 est. value
Hanover, MA

J--Plumbing and Pipefitting BOA
Post-Bid

Boathouse Painting
Results
Scituate, MA 02066

J--Electrical Services BOA
Post-Bid

Scheduled and Emergency Facility Electrical Repairs and Improvements at Various Locations
Results
Less than $137,050 est. value

Last Updated 01/03/2019 05:15 AM
Project Title

Dining Hall Buildout - Sub Bid

Physical Address View project details and contacts
City, State (County) Brockton, MA 02302   (Plymouth County)
Category(s) Single Trades
Sub-Category(s) Electric, Finishes/Interior, HVAC, Painting, Plumbing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Architect - 11/27/18
Owner View project details and contacts
Architect View project details and contacts
Description The project includes all labor, materials, equipment and supervision required for the renovation of an existing area of the Brockton Campus. Demolition of demountable and stud frames walls, ceilings, lighting, HVAC ductwork and finishes, construction and finish work in required space , construction of office, reception and dining hall space layouts, asbestos removal for flooring and replacement windows and work required for HVAC, Electrical and Plumbing for the new layout.
Details
Division 09 - Finishes, Painting.
Division 22 - Plumbing, Common Work Results for Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents