Similar Projects
Southern Commons - Master Plan
New Construction
Conception
Cayce, SC 29172

Go Storeit
Renovation - 70,729 SF
Conception
Hilton Head Island, SC 29926

Spencer's Trail
New Construction
Design
Anderson, SC

Broadway Self Storage
New Construction - 125,294 SF
Design
$10,000,000 CJ est. value
Mount Pleasant, SC 29464

Whittemore Elementary School Property
Infrastructure
Bidding
Conway, SC

Juniper Street Residences Affordable Housing Development
New Construction, Infrastructure
Bidding
$4,000,000 CJ est. value
Charleston, SC 29407

Construction of 25,000SF Building Pad
Post-Bid
Less than $300,000 est. value
Beaufort, SC 29906

Citadel At Palmetto Bluff Storage Facility
New Construction - 90,000 SF
Post-Bid
$5,500,000 est. value
Bluffton, SC 29910

Transfer Station Addition
Results
Orangeburg, SC 29115

Metal Storage Building at McBee WM
Results
McBee, SC 29101

U-Haul Self Storage and Truck Rental Facility
New Construction - 131,650 SF
Construction
Rock Hill, SC

Fox Rae Farms - Infrastructure
New Construction
Construction
Conway, SC 29526

Carolina Fresh Farms Retail
New Construction - 6,400 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Aiken, SC

Grace Episcopal Church Parish Hall
New Construction, Infrastructure
Design
$5,000,000 CJ est. value
Charleston, SC 29401

Berkeley Charleston Tradeport Buildings 2 and 6
New Construction - 925,000 SF
Post-Bid
$10,000,000 CJ est. value
Summerville, SC 29483

Last Updated 08/29/2022 04:09 PM
Project Title

Tri Star Storage II

Physical Address View project details and contacts
City, State (County) Wedgewood, SC 29168   (Sumter County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Site Development, Warehouse/Storage
Contracting Method Bids by Invitation
Project Status Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $4,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Major Site Plan was presented to the Sumter City-County Planning Commission August 24, 2022. Information regarding architect or contractor has yet to be determined. Although a firm timeline has yet to be announced, construction is estimated to begin fourth quarter 2022. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

35,068 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents