Similar Projects
194 Cannon Street Hotel
New Construction
Conception
Charleston, SC

160 St. Phillip Street Parking Garage
New Construction - 138,481 SF
Design
$10,000,000 CJ est. value
Charleston, SC 29403

Magnolia
Design
Charleston, SC

Painswick and Stanwick Road Paving TST
Bidding
Johns Island, SC 29455

2020 Resurfacing Plan TST
Bidding
North Charleston, SC 29405

Paving Roadway at BB Lot
Post-Bid
Charleston, SC 29403

Asphalt Paving of Roadway at Bb Lot
Post-Bid
SC 29403

FDP, Thin Overlay Surf D
Results

US 17 (Savannah Hwy) at SC7 (Sam Rittenberg Blvd) Left Turn Lane Extension TST
Results
North Charleston, SC

Wild Dunes Resort Hotel
New Construction
Construction
Isle of Palms, SC 29451

Charleston Technology Center
New Construction
Construction
Charleston, SC

Elan Montague Apartment
New Construction
Pending Verification
North Charleston, SC

2020 Onyx Mastic Surface Treatment Plan TST
Bidding
North Charleston, SC 29405

On Call Permanent full Depth Asphalt Pavement Patching
Term Contract
Post-Bid
Mount Pleasant, SC

Rivers Avenue at Mall Drive Turn Lane at MUSC Facility TST
Results
North Charleston, SC 29405

Reported 04/17/2019 08:41 AM
Project Title

Parking Garage and Associated Roadway Construction (PARC)

Physical Address View project details and contacts
City, State (County) SC   (Charleston County)
Category(s) Heavy and Highway
Sub-Category(s) Parking Garage, Paving/Reconstruction
Contracting Method
Project Status Construction Commenced February 2019
Bids Due View project details and contacts
Estimated Value $87,506,823
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description The Charleston County Aviation Authority is requesting SOQs from qualified contractors for the construction of a new, one (1) million square foot, 5-story, cast-in-place, open parking garage with elevated walkway and associated site and roadway work at Charleston International Airport. This project includes the parking garage, elevated pedestrian passageway, site and roadway work, mechanical, electrical, telecom and wayfinding systems. In addition, lighting, access control, revenue control, and landscaping will be included.
Details
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 10 - Specialties, Signage, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Vehicle and Pedestrian Equipment.
Division 21 - Fire Suppression.
Division 26 - Electrical, Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents