Similar Projects
Building Shoring and Stabilization
Post-Bid
$30,000 est. value
Boston, MA 02125

Clearing, Grubbing, Site Grading, Installation of Water and Drain Utilities
Infrastructure
Post-Bid
$325,000 est. value
Winthrop, MA

Drilling IDIQ in Massachusetts and Rhode Island
Results

Scheduled and Emergency Catch Basin and Pipe Cleaning at Various Locations (Excluding the Islands)
Results
$850,000 est. value

Everett Trench Drain
Infrastructure
Post-Bid
Boston, MA

Annual Maintenance and Service of Hydraulic Oil Systems
Results
$712,000 est. value
Boston, Dedham, Everett, Newton, Revere, Somerville, MA 02129

Drain Cleaning
Infrastructure
Post-Bid
Boston, MA

Annual Underwater Maintenance and Service
Results
$1,168,000 est. value
Boston, Dedham, Everett, Newton, Revere, Somerville, MA

Emergency Drain Preventative Maintenance Contract
Infrastructure
Post-Bid
$100,000 est. value
Boston, MA

MP2001-C1 - FY21-22 Small Item Waterfront Repair
Results
$1,050,000 est. value
East Boston, MA

FY21-22 Waterfront Repair Term Contract
Results
$890,953 est. value
East Boston, MA

Scheduled and Emergency Drainage and Erosion Repairs at Various Locations (Including Martha's Vineyard)
Results
Less than $716,412 est. value

Drilling IDIQ In Massachusetts and Rhode Island
Results

Scheduled and Emergency Drainage Repairs and Improvements
Infrastructure
Results
$1,418,351 est. value

Emergency Repairs to Sewers and Drains Citywide
Infrastructure
Results
$1,600,000 est. value
Roxbury, MA

Reported 02/24/2022 12:00 AM
Project Title

Pine Tree Brook Reservoir Dam Decommissioning and Stream Restoration Project

Physical Address View project details and contacts
City, State (County) Boston, MA   (Suffolk County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel, Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $75,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Mobilization to Site, provisions and installation of temporary facilities (including police details as needed); provision and installation of temporary sediment, erosion controls and temporary water controls; demolition/removal of the Pine Tree Brook Dam (including lawful off-site disposal of all debris) and restoration of the stream channel; and site restoration and demobilization from the Site. All work shall be done in conformance with permit conditions and special care shall be taken to minimize impacts to the Brook and all wetland areas.

Details

Dam/Tunnel, Renovation.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Erosion and Sedimentation Controls, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents