Similar Projects
Peracetic Acid Disinfection System Improvements
Post-Bid
Sutherland, KY 40004

Wastewater Treatment Plant Upgrade - Contract V
Renovation
Results
$20,000,000 est. value
Nicholasville, KY

Wastewater Treatment Plant Improvements - Phase 1
Post-Bid
Middlesborough, KY

Replacement of Dewatering Equipment at West Hickman WWTP
New Construction
Results
Nicholasville, KY 40356

Sanitary Sewer Rehabilitation Contract 3
New Construction
Post-Bid
$1,320,000 est. value
Elkton, KY

Wastewater Treatment Plant and Collection System Improvements
Results
Whitesville, KY

Bells Lane WWTF Disinfection System Upgrades
Results
$50,000 to $499,999 est. value
Louisville, KY 40211

Flat Lick WWTP Replacement
Renovation
Post-Bid
$350,000 est. value
Flat Lick, KY 40935

West Hickman WWTP Water Strainer Replacement
Results
Lexington, KY

Wastewater Treatment Plant Replacement
Renovation
Results
$308,820 est. value
Grayson, KY 41143

EC McManis WWTP Headworks Improvements
Renovation
Post-Bid
Frankfort, KY 40601

Wastewater Treatment Plant
Results
Less than $11,500,000 est. value
Marion, KY

200,000 Gallon Equalization Basin
Renovation
Results
$1,000,000 est. value
Dry Ridge, KY 41035

Wastewater Facilities Improvements - Contract A - Sanitary Sewer Rehab And WWTP Modifications - Contract B
Post-Bid
Dawson Springs, KY

Last Updated 12/22/2021 06:16 AM
Project Title

Camp Robert C. Webb WWTP Replacement

Physical Address View project details and contacts
City, State (County) Grayson, KY 41143   (Carter County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $308,820
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of the replacement of an existing in-ground, steel package wastewater treatment plant with a new 6,500 gal/day pre-engineered, precast concrete, extended aeration package wastewater treatment plant. In addition there are electrical improvements associated with the construction of the new plant, including a new standby electrical generator.

Details

Sewage Treatment Plant, New Construction.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents