Similar Projects
SR 16 at Flint River 8 Mi W of Griffin
Infrastructure
Design
$6,000,000 CJ est. value
Griffin, GA 30224

SR 16 at Flint River 8 Mi W of Griffin
Infrastructure
Design
$6,000,000 CJ est. value
Griffin, GA 30224

TSPLOST Resurfacing Phase IA
Infrastructure
Bidding
$400,000 CJ est. value
Griffin, GA 30223

TSPLOST Resurfacing Phase IA
Infrastructure
Bidding
$400,000 CJ est. value
Griffin, GA 30223

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

2021 LMIG Project
Results
Mount Vernon, GA

Milling and Resurfacing FY21
Results
Griffin, GA 30223

Wallace Road Warehouse
New Construction, Infrastructure - 100,000 SF
Pending Verification
$5,000,000 CJ est. value
Griffin, GA 30223

Janet Street Industrial Development
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Griffin, GA 30224

SR 3/US 19 From 0.14 Mi S of SR 7 to Henry County Line
Infrastructure
Design
$9,000,000 CJ est. value
Griffin, GA 30223

Pavement Evaluations for Interstate Maintenance
Alteration
Post-Bid
$25,000 est. value

2020 CDBG Park District 2 - Phase II
Results
Griffin, GA

Tomochichi Road Industrial Development
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Griffin, GA 30223

SR 92 From SR 3 to 0.17 Mi E of CR 347 / Westmoreland Road
Infrastructure
Design
$1,000,000 CJ est. value
Griffin, GA 30223

Last Updated 09/29/2022 04:06 PM
Project Title

2021 CDBG D.F. Fuller Revitalization Area Phase I

Physical Address View project details and contacts
City, State (County) Griffin, GA 30224   (Spalding County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $1,337,887 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Goals for minority participation 19.5% Goals for female participation 6.9% The approximate extent and character of the Work is generally described as follows: Installation of approximately 4,202 linear feet of 6-inch ductile iron water main and related appurtenances. Also included in the project is the abandonment of 2,487 linear feet of 6" A/C water main and 1,235 linear feet of 2-inch galvanized water main. The project also includes sanitary sewer point repairs consisting of replacing 20 feet of 8-inch sanitary sewer main at 9 locations. The project will be finalized with milling and overlaying the streets within the project area. The quantity of milling and overlay area is 10,525 square yards. This is a Section 3 Covered Project under the HUD Act of 1968 and Section 3 Residents and Business Concerns are encouraged to apply. The City of Griffin is committed to providing all persons with equal access to its services, programs, activities, education, and employment regardless of race, color, national origin, religion, sex, familial status, disability or age. Contractor questions regarding the bid should be directed to Jason Graham via email at jgraham@pcgeng.com. All questions must be submitted in writing. The last day for contractor questions is 5:00 PM, local time Friday, July 22, 2022. The time allowed for Substantial Completion is 180 days, and the time allowed for completion and readiness for final payment is 210 days from the date of commencement. Each Bid must be accompanied by a Bid Bond completed on the attached Bid Bond Form with good and sufficient surety or sureties approved by the owner for faithful acceptance of the contract, payable to, in favor of, and for the protection of the OWNER in an amount equivalent to five (5%) of the total amount payable by the terms of the contract, in lieu thereof, in the form of a certified check, cashiers check, or cash in equal amount. Performance and Payment Bonds, each in an amount at least equal to 110 percent of the contract amount, and a Certification of Insurance will be required. A Certification of Insurance will be required from the low bidder prior to award of the Contract. All Bids will remain subject to acceptance for ninety days after the day of the Bid opening, butOWNER may, in its sole discretion, release any Bid and return the Bid security prior to that date. The Owner reserves the right to reject any or all Bids, to waive formalities and re-advertise

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents