Similar Projects
Pumping Station Rehabilitation-Lake A - City of Wheaton
Renovation
Conception
$375,000 CJ est. value
Wheaton, IL 60187

Fall Circle Lift Station - Village of Roselle
Infrastructure
Conception
$450,000 CJ est. value
Roselle, IL 60172

Reconstruction of Harger Road Lift Station
Demolition, New Construction, Infrastructure
Bidding
$1,250,000 CJ est. value
York Township, IL 60523

Mill Pond Lift Station Improvements Project
Renovation
Bidding
$200,000 CJ est. value
Glendale Heights, IL 60139

Well 2 Inspection and Repair
Infrastructure
Post-Bid
$700,000 CJ est. value
Hinsdale, IL 60521

Decommision and Abandonment of Well No.10
Infrastructure
Post-Bid
$200,000 CJ est. value
Villa Park, IL 60181

Centex Pumping Station Replacement
Renovation
Results
Downers Grove, IL 60516

York Road (LS-10) Lift Station Improvements
Renovation
Results
Bensenville, IL 60106

President Street Pump Station Repairs - City of Wheaton
Renovation, Infrastructure
Conception
$250,000 CJ est. value
Wheaton, IL 60187

Lift Station Control Center Replacement
Renovation
Post-Bid
$408,000 CJ est. value
West Chicago, IL 60185

Summerfield Lift Station Rehabilitation
Renovation
Results
Naperville, IL

Den Lift Station Rehabilitation - Village of Roselle
Renovation, Infrastructure
Conception
$475,000 CJ est. value
Roselle, IL 60172

Klefstad Lift Station and Force Main Improvements
Infrastructure
Post-Bid
$590,000 CJ est. value
Wood Dale, IL 60191

Centennial Beach Stormwater Lift Station Pumps and Controller Replacement
Renovation
Results
$200,000 est. value
Naperville, IL 60540

Country Lakes Wastewater Pump Station Improvements/Upgrades - WW062 - City of Naperville
Renovation, Infrastructure
Conception
$450,000 CJ est. value
Naperville, IL 60540

Last Updated 03/17/2023 12:09 PM
Project Title

Wheaton Pump Stations Variable Frequency Drive Additions

Physical Address View project details and contacts
City, State (County) Wheaton, IL 60187   (DuPage County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected April 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Last Date for Questions: No later than February 28, 2023, at 11:00 am (CST) Prevailing Wages: Prevailing Wage Act (820 ILCS 130/1-12) - DOES APPLY All questions, either administrative or technical, shall be submitted via email to Tina Walters at twalters@wheaton.il.us no later than February 28, 2023, at 11:00 am (CST). Work of the Project includes the following: 1. Install new VFDs at various booster stations and pump stations throughout the city. 2. Replace motors as indicated on plans. 3. Interconnect new VFDs into existing SCADA network. Contract Award - By 03/20/2023 PROJECT LOCATION 210 S. Reber St. Wheaton, IL 1590 S. President St.Wheaton, IL 615 Countryside Wheaton, IL

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents