Similar Projects
Senior Services Vehicle Shelter
Bidding
CO

2020 Concrete Replacement Project
Post-Bid
Evans, CO 80620

Concrete Contractors for Pouring Concrete Slabs at the Alamosa K-2 Elementary School
Post-Bid
Alamosa, CO 81101

Boat Ramps and Two Parts of the Trail Extension
Results
Denver, CO

Water World Voyage to Center of Earth Tunnel and Vortex Concrete Repair
Results
Less than $200,000 est. value
Federal Heights, CO 80260

Concrete Work for The Fowler Cemetery
Post-Bid
Fowler, CO

2020 Concrete Installation, Removal and Replacement Services
Term Contract
Results
Less than $3,000,000 est. value
Golden, CO

Concrete Replacement Project - 2020 Roadway Improvement Areas
Post-Bid
Windsor, CO 80550

2020 Citywide Concrete Panel Replacement
Results
$962,289 to $1,176,131 est. value
Denver, CO

2020 Concrete Infrastructure Rehabilitation South Program
Post-Bid
Aurora, CO 80012

SH16 at MP 0.4 just East of I-25: Remove and Replace Concrete Panel approaching J-18-Bo Structures on EB at SH 16
Results
Less than $1,000,000 est. value
CO

2020 Concrete Replacement Program
Post-Bid
Golden, CO 80401

2020 Concrete Replacement
Results
Less than $2,740,902 est. value
Louisville, CO 80027

Compark South Filing 1 Concrete Flatwork
Post-Bid
Greenwood Village, CO 80111

2020 Concrete Replacement
Results
Aspen, CO 81611

Last Updated 01/23/2020 10:43 AM
Project Title

Cured In Place Pipe (CIPP) Project

Physical Address View project details and contacts
City, State (County) CO   (Douglas County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value Less than $300,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project is located in the Town of Castle Rock, Colorado. The work is primarily within residential neighborhoods and open space near South Street. The work consists of construction of approximately 10,524 linear feet of Cured In Place Pipe within existing 8-inch diameter vitrified clay sanitary sewer pipe with approximately 151 service taps. Pavement removal and replacement, and replacement of curb, gutter, and landscaping disturbed during construction as necessary to restore site following any open-cut point repairs. Public notification, traffic control and erosion control as required to complete the work. Owner will pay for third party testing. Contractor will provide samples from every segment for independent material testing by Owner.

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents