Similar Projects
HVAC Installation and Energy Infrastructure
Alteration
Post-Bid
Union City, CA

Highland Hospital Koret Building Exhaust Fan and Waterproofing
Alteration
Post-Bid
$1,900,000 est. value
Oakland, CA

Harvest Park Middle School Gym Boilers Replacements
Alteration
Results
Pleasanton, CA 94566

HVAC Repairs
Alteration
Results
Oakland, CA 94612

HVAC A-E and Construction Management Services
Renovation, Term Contract
Post-Bid
Less than $65,000,000 est. value
Livermore, CA 94550

HVAC Repairs
Alteration
Results
CA

District Wide Roofing and HVAC Replacement Project Package Five
Alteration
Post-Bid
Pleasanton, CA 94566

USCG Alameda Replace HVAC and Roofs
Infrastructure
Results
$500,000 to $1,000,000 est. value
Alameda, CA

Regular and On-Call Heating, Ventilation, and Air Conditioning (HVAC) Services
Alteration
Post-Bid
Livermore, Martinez, Oakland, Oakley, Redwood City, Richmond, San Jose, San Pablo, Vallejo, CA 94603

Relocate HVAC Ductwork and Furnish and Install Fire/Smoke Dampers (Alameda County)
Alteration
Results
$388,000 est. value
Oakland, CA 94612

HVAC Services at Northern California DWR Facilities
Alteration
Post-Bid
Byron, CA 94514

O'Brien Hall HVAC Improvements
Alteration
Results
$160,000 est. value
Berkeley, CA

Air Intake Dampers Replacement Services
Alteration
Post-Bid
Oakland, CA 94612

DM FY20 Anthropology and Art Practice Bldg Hearst Museum HVAC Improvements
Renovation
Results
$396,915 CJ est. value
Berkeley, CA 94720

Hvac Preventive Maintenance And As Needed Repair Services
Term Contract
Post-Bid
CA

Last Updated 04/28/2023 06:02 AM
Project Title

Henry Robinson Multi-Purpose Center HVAC Replacement

Physical Address View project details and contacts
City, State (County) Oakland, CA 94612   (Alameda County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Results, Construction start expected February 2022
Bids Due View project details and contacts
Estimated Value $768,600 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed work consists, in general, of the removal and disposal of the existing HVAC System and the installation of two new system HVAC systems at the Henry Robinson Multi-Service Center building. Questions Due:November 22, 2021, by 2:00 PM by email to the Project Manager. It is the Contractor's responsibility to ensure that the email is received by the Project Manager. Any addendum that materially changes the bid invitation shall be issued no less than 72 hours before the bid opening, unless the bid opening is extended by said addendum. Liquidated Damages: $1,000 per calendar day Bonds: 10% Bid Security; 100% Payment and Performance Bonds Oakland-certified Local Business Requirement: The 50% local participation is waived. The 50% Local Employment and 15% apprenticeship requirements are not waived.Self-Performance: 30% minimum, excluding Specialty Items if any per the Bid Schedule. See Special Provisions MECHANICAL REMOVE (E)HVAC UNITAGI FROM LOWER ROOF LEVEL. REPLACE (E) UNITWITH ENERGYEFFICIENT MODEL. REPLACE (E)VAV EQUIPMENT. REPAIR (E)DUCTWORK ELECTRICAL EVALUATION OF(E)ELECTRICAL SUPPLY SYSTEM CONTROLS t HREALARM. UPDATE SYSTEM AS SHWQN ON DRAWINGS STRUCTURAL EVALUATION AND MODIFICATION O* EXISTING ROOF STRUCTURE UPDATE EXISTING ROODSTRUCTURE AS REQUIRED FQR NEV; EOu^MENT. ARCHITECHTURE PROVIDE (N)CURBS8 PENETRATIONSFOR REQUIREDINSTALLATIONS (E, ROOF PENETRATIONSWill REOLARE PATCHING4 ROOF-MEMBRANE REPAIR RELATEDFINISHES AND MOD*X>T10N$OUTLINED HEREIN.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents