Similar Projects
CTH M/CTH PB Intersection Expansion Project
Infrastructure
Bidding
$1,300,000 est. value
Vernon, WI

CTH VV (Main Street) and Plainview Road Water Main Project
Infrastructure
Bidding
Sussex, WI 53089

2021 Street Maintenance
Post-Bid
Oconomowoc, WI

Bituminous Surfacing
Post-Bid
Watertown, WI

Road and General Construction Multiple Award IDIQ for the Chequamegon-Nicolet NF
Results
$5,000 to $7,000,000 est. value

Road and General Construction Multiple Award IDIQ for the Chequamegon-Nicolet NF
Results
$5,000 to $7,000,000 est. value

2022 Street and Utility
Infrastructure
Bidding
Waterloo, WI

Curb and Gutter and Sidewalk Replacement
Post-Bid
Watertown, WI

Menomonee Park DEA Asphalt and Concrete Paving
Results
Menomonee Falls, WI 53051

Seal Coating, Routing and Crack Sealing
Post-Bid
Watertown, WI

Montello - Wautoma, Marquette Co. Line/CTH JJ - STH 21
Results
Marquette, Montello, Wautoma, WI 54970

2021 Road Program
Post-Bid
Brookfield, WI 53045

Hillendale Drive Reconstruction
Results
Muskego, WI 53150

2021 Road Improvement Program
Post-Bid
Delafield, WI

2021 Street Projects 47
Results
Less than $2,000,000 est. value
Oconomowoc, WI

Last Updated 01/18/2022 08:15 AM
Project Title

Watertown - Waukesha, UP RR Structure, B-14-0041 and 42

Physical Address View project details and contacts
City, State (County) Watertown, Waukesha, WI (Jefferson, Waukesha Counties)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Excavation Common, 2,317 CY; Backfill Structure, 122 Ton; Base Aggregate Dense, 1,999 Ton; Select Crushed Material, 2,273 Ton; Breaker Run, 6 Ton; Concrete Pavement, 1,943 SY; Concrete Masonry Bridges, 203 CY; Concrete Masonry Culverts, 10 CY; Bar Steel Reinforcement Coated, 48,720 Lbs; Marking Epoxy, 3,936 LF; Construction Staking, 1,960 LF; Construction Staking, 2 Each; Construction Staking, 1 LS; Culvert Pipe, 150 LF 12”; Concrete Curb and Gutter, 56 LF; Beam Guard, 162 LF; Beam Guard Energy Absorbing Terminals, 2 Each; Asphaltic Surface, 124 Ton.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents