Similar Projects
Last Updated | 01/08/2024 10:16 AM |
Project Title | ADA/OCR Restroom Upgrades Phase 2A - Asnuntuck Community College |
Physical Address | View project details and contacts |
City, State (County) | Enfield, CT 06082 (Hartford County) |
Category(s) | Education |
Sub-Category(s) | College/University |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected July 2023 |
Bids Due | View project details and contacts |
Estimated Value | $217,650 [brand] Estimate |
Plans Available from | Architect |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | ADA Restroom Upgrades Phase 2 Asnuntuck Community College. As security, each bid must be accompanied by a Certified Check payable to the Treasurer of the State of Connecticut, OR the bid must be accompanied by a Bid Bond, AIA Form A-310, having as surety thereto such Surety Company or Companies as are authorized to do business in this State for an amount not less than 10% of the Bid. The awarding authority reserves the right to waive technical defects or to reject any and all bids. Performance and Payments Bonds shall be furnished by the successful bidder awarded the contract in an amount of 100% of the Contract Sum. Prevailing wage rates apply to this project. See Article 01014 of The Supplementary General Conditions. The contract to be awarded is subject to contract compliance requirements mandated by Sections 4a-60 and 4a-60a of the Connecticut General Statutes; and, when the awarding agency is the State, Sections 46a-71(d) and 46a-81i(d) of the Connecticut General Statutes There are Contract Compliance Regulations codified at Section 46a-68j21 through 43 of the Regulations of Connecticut State Agencies, which establish a procedure for awarding all contracts covered by Sections 4a-60, 4a-60g, and 46a-71(d) of the Connecticut General Statutes The Contractor who is selected to perform this state funded project must file and receive an approved plan by the Commission on Human Rights and Opportunities prior to the commencement of construction. This project is therefore subject to the state set-aside goals of 25% SBE and 6.25% MBE on the entire state contract amount. Requirements for insurance coverage for the successful bidder are as outlined in The General Conditions of the Contract. Certificates of coverage for the required insurance shall be submitted to the Owner prior to commencing the Work. Contract Documents Consist Of The Project Manual Containing The Instructions To Bidders, Bid Form, The General Conditions Of The Contract, Supplementary General Conditions And Technical Specifications Sections As Are Found Bound Together And The Drawings, Both Titled "asnuntuck Community College Ada/ocr Restroom Upgrades Phase 2a 170 Elm Street, Enfield, Ct", And Dated, February 16, 2023 In award of contract, Performance and Payments Bond will be required in an amount of 100% of the contract amount. |
||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |