Project Title | Bacon Creek Culvert Improvements, Phase I & II - 549-156 - City of Sioux City |
Physical Address | View project details and contacts |
City, State (County) | Sioux City, IA 51101 (Woodbury County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Shoreline/Erosion/Drainage, Site Development |
Contracting Method | Competitive Bids |
Project Status | Design Development, Construction start expected June 2025 |
Bids Due | View project details and contacts |
Estimated Value | $20,442,068 [brand] Estimate |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Phase 1: This phase of the project requires the construction of a small concrete dam to divert normal flows to the newer box culvert yet still allow high flows to drain through both culverts. Much of the bottom of the older culvert is missing and will need to be re-poured with quick-form concrete to prevent future damage. During low flow periods, the old culvert will have to be cleaned mostly by Bobcat and dried out prior to pouring the concrete. Phase 2: The second phase of the project would likely extend the Bacon Creek box culvert between Gordon Dr. and Correctionville Rd. from S Alice St on the west side of the Gordon Plaza, to S Rustin St - a total distance of approximately 800 feet; An alternative option under consideration is to purchase one or two properties and re-grade the existing channel near the bridge on S Helen. The project is included in the city's 2023-2027 Capital Improvement Program (CIP). As of September 28, 2022, a design engineer has been selected. Bidding is anticipated to take place in 2025. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. As of July 18, 2023, no rebid information available |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |