Similar Projects
Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

CA ERFO KLAMATH NF 18N31(1) UPPER WEST BRANCH BRIDGE
Renovation, Alteration
Design
CA

RFQ Contractor - Discovery Marsh Trail
Infrastructure
Bidding
$2,000,000 CJ est. value
Tulelake, CA 96134

RFQ Contractor - Discovery Marsh Trail
Infrastructure
Bidding
$2,000,000 CJ est. value
Tulelake, CA 96134

HMA Overlay and Replace AC Surfacing
Infrastructure
Post-Bid
$1,010,000 est. value
CA

Manila Highway 255 Shared Use Path
Alteration
Post-Bid
$888,055 est. value

Roadway Ex, Hydraulic Biotic Growth Med and Midwest Guardrail System
Infrastructure
Results
$3,770,000 est. value
Mount Shasta, CA 96067

Kitchen/Cafeteria Building (Increment 1) at Weed Elementary School - Earthwork
New Construction, Infrastructure
Results
Weed, CA 96094

Fish Passage - Replace Culverts with Bridges
Infrastructure
Design
$11,155,000 CJ est. value
Yreka, CA 96097

Wastewater Collection System Improvements Project
Infrastructure
Bidding
$6,500,000 CJ est. value
Yreka, CA 96097

Pavement Replacement
Infrastructure
Post-Bid
$280,000 est. value

Main Road Construction
Infrastructure
Results
Tulelake, CA

Rehabilitate Pavement
Infrastructure
Design
$32,229,000 CJ est. value
Tulelake, CA 96134

Municipal Water Well Project
Infrastructure
Bidding
$1,000,000 CJ est. value
Dorris, CA 96023

Newell Sewer Collection and Lagoon Improvements
Infrastructure
Post-Bid
$4,000,000 CJ est. value
Newell, CA 96134

Last Updated 01/06/2023 03:21 PM
Project Title

CHP Mount Shasta Area office - Parking Lot Repairs Services

Physical Address View project details and contacts
City, State (County) Mount Shasta, CA 96067   (Siskiyou County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Questions Due: November 10, 2022 at 10:00 AM The term of the resulting agreement is anticipated to be effective from April 1, 2023 through March 31, 2024. The agreement term may change if CHP makes an award earlier than expected or if CHP cannot execute the agreement in a timely manner due to unforeseen delays. CHP reserves the right to extend the term of the resulting agreement as necessary to complete or continue the services. Agreement extensions are subject to satisfactory performance, funding availability, and possibly approval by Department of General Services (DGS). Contractor agrees to provide to the Department of California Highway Patrol (CHP) Mount Shasta Area office, the services described herein: furnish all supplies, materials, tools, equipment, labor, personnel, and supervision; pay all taxes, insurance, bonds, license and permit fees, and all other direct and indirect costs necessary to provide Parking Lot Repair Services as set forth in this Agreement. If you have any questions, contact Tessa Gomez Contract Services Unit at (916) 843-3613.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents