Similar Projects
2022 Sidewalk Improvements Project
Infrastructure
Bidding
$300,000 est. value
Arbon, ID 83212

Stoddard Pathway Extension Phase 3
Infrastructure
Bidding
$150,000 est. value
Bowmont, ID 83686

Construction Services for Cleanup of Upper Basin of the Bunker Hill Mining and Metallurgical Complex Superfund Site
Infrastructure, Alteration
Post-Bid
ID

Culvert Replacement
Infrastructure
Post-Bid
Nampa, ID 83687

DIJ Construct Taxilane
Infrastructure, Alteration
Results
$1,255,580 est. value
Driggs, ID 83422

Ramsey Z-Wall Extension
Addition, Alteration
Results
Coeur d'Alene, ID 83815

Replace / Install Parking Lot Drains, Idaho State Veterans Home
Infrastructure
Bidding
$321,500 est. value
Pocatello, ID 83201

Main Street Sidewalk ADA Ramps
Alteration
Post-Bid
Lapwai, ID

Idaho Community Development Block Grant
New Construction, Infrastructure
Results
$175,174 est. value
Moscow, ID 83843

Parking Lot and Utilities Demolition
Infrastructure
Post-Bid
Coeur d'Alene, ID 83814

Constructing a Stiff Leg Culvert on SH-21 MP 123
Infrastructure
Results
$1,000,000 to $2,500,000 est. value
ID

Desmet Road Pedestrian Trail Project
Alteration
Post-Bid
Plummer, ID

Pedestrian Path Connection Plan
Infrastructure
Results
$250,000 to $500,000 est. value
ID

Replacement of Concrete
Infrastructure
Post-Bid
Harrison, ID

Adding Bicycle Land Updating Sidewalks
Infrastructure
Results
$10,000,000 to $15,000,000 est. value
Bonners Ferry, ID

Last Updated 06/09/2022 03:49 AM
Project Title

Children Pedestrian Safety Grant

Physical Address View project details and contacts
City, State (County) Moscow, ID   (Latah County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $250,000 to $350,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of work at two sites. The B and Cleveland portion of the project includes removal of existing asphalt surface, the replacement of soil and grass, the removal and replacement of an asphalt pathway, asphalt patch back, removal and replacement of concrete sidewalk and Type A curb, installation of pedestrian ramp, removal and replacement of a drainage structure, the abandonment of drainage pipe, installation drain pipe, installation of top soil and grass. The D and Mountainview portion of the project includes drainage structure removal, the abandonment of drainage pipe, the installation of a drainage structure, the installation drainage pipe, installation and adjustment of a solid metal catch basin cover, the removal and replacement of sidewalk, installation of pedestrian ramps, the removal and replacement of Type B curb and gutter, the removal and replacement of Type A curb, the obliteration and installation of line marking and thermoplastic symbols, adjustment of utilities, removal and replacement of signs, and the removal and replacement of asphalt surface.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents