Similar Projects
Pavement Marking on Various Routes
Infrastructure
Design
$200,000 CJ est. value
Chicago, IL 60652

Painting of Oak Park Avenue Pedestrian Light Poles
Infrastructure
Sub-Bidding
$56,000 CJ est. value
Tinley Park, IL 60477

Library Repainting
Renovation
Sub-Bidding
$193,000 CJ est. value
Flossmoor, IL 60422

Painting services for Two District 214 Field House Ceilings
Post-Bid
Arlington Heights, IL

Northbrook Sports Center Replacements Painting
Renovation
Post-Bid
Northbrook, IL 60062

Cleaning and Painting Existing Steel Structures at 3 locations
Alteration
Results
River Grove, IL

Briar Lane Elevated Water Storage Tank Maintenance and Repainting
Infrastructure
Results
Less than $564,800 est. value
Oak Forest, IL

GAP #0503 - Refresh
Renovation
Construction
Chicago, IL 60657

Placing Various Width of Thermoplastic, Preform Plastic, Modified Urethane and Hot Spray Thermoplastic Pavement Marking
Infrastructure
Sub-Bidding
$100,000 CJ est. value
Chicago, IL 60652

Painting of Final Tanks at Various Locations
Post-Bid
$2,770,000 est. value
Chicago, IL

Bridge Painting on (SNs 016-0343, 016-0344) Carrying US Route 45 over the Cal Sag Channel in unincorporated Cook County
Alteration
Results
IL

Public Works Main Garage Painting
Post-Bid
Mount Prospect, IL

Four Flaggs Tank Rehab, Painting and Tower Facilities Lightning Protection and Oriole Tower Lightning Protection
Infrastructure, Alteration
Results
Niles, IL 60714

Miscellaneous Painting
Post-Bid
Olympia Fields, IL 60461

Water Tower and Soffit Repair and Painting
Alteration
Post-Bid
Western Springs, IL

Last Updated 08/22/2022 03:04 PM
Project Title

Oriole Pool Painting Project

Physical Address View project details and contacts
City, State (County) Morton Grove, IL 60053   (Cook County)
Category(s) Single Trades
Sub-Category(s) Painting
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $220,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Specifications and bid forms are available at the Park District's Administration Office, 6834 West Dempster, Morton Grove, IL 60053-2631, between 9:00 a.m. - 5:00 p.m., Monday - Friday commencing on July 1, 2022, or in PDF format at the District's website: www.morotngroveparks.com. The Morton Grove Park District is accepting sealed bids for pool painting services for the Park District's Oriole Pool. Questions regarding this bid should be submitted in writing to Keith Gorczyca, Superintendent of Parks at kgorczyca@mgparks.com The Morton Grove Park District Board of Park Commissioners reserves the right to waive all technicalities, to accept or reject any or all bids, to accept only portions of a proposal and reject the remainder without disclosure for any reason. Failure to make such a disclosure will not result in accrual of any right, claim or cause of action by any Bidder against the Morton Grove Park District. Bids shall not include federal excise tax or state sales tax for materials and equipment to be incorporated in, or fully consumed in the performance of, the work. An Exemption Certificate will be furnished by the Morton Grove Park District on request of the Bidder, for use in connection with this project only. All bid proposals must be accompanied by a bid bond or bank cashier's check payable to the Morton Grove Park District for ten percent (10%) of the amount of the bid as provided in the Instructions to Bidders. No proposals or bids will be considered unless accompanied by such bond or check. The Work of this Project is subject to the Illinois Prevailing Wage Act, 820 ILCS 130/0.01 et seq. A prevailing wage determination has been made by the Illinois Department of Labor for public works projects in Cook County. The Contract entered into for the Work will be drawn in compliance with said law and proposals should be prepared accordingly and provide for payment of all laborers, workmen, and mechanics needed to perform theWork at no less than the prevailing rate of wages (or the prevailing rate for legal holiday and overtime work) foreach craft, type of worker, or mechanic. The contractor selected will also be required to comply with all applicable federal, state and local laws, rules, regulations and executive orders including but not limited to those pertaining to equal employment opportunity The Work for the Contract shall commence on August 15, 2022, or on such earlier date as may be agreed upon by the parties. Contractor shall achieve Final Completion on or before September 30, 2022, unless otherwise extended by agreement of the parties pursuant to the General Conditions.

Details

Division 09 - Finishes, Painting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents