Similar Projects
Maintenance Warehouse Project
New Construction
Post-Bid
Pearcy, AR 71964

Maintenance Warehouse Project
New Construction
Post-Bid
Pearcy, AR 71964

Construction Manager for School Facility
Results
Benton, AR

Northeast Claiborne Charter School Administration Building
New Construction, Infrastructure - 1,556 SF
Construction
$300,000 CJ est. value
Junction City, AR 71749

Construction of an Outdoor Pavilion
New Construction, Infrastructure
Pending Verification
$600,000 CJ est. value
Cotter, AR 72626

Career Center Interior Remodel
Renovation
Post-Bid
Gravette, AR 72736

4 Portable Buildings
New Construction
Post-Bid
Dierks, AR

Pottsville School District Band Grandstand
New Construction
Post-Bid
Pottsville, AR 72858

Construction Manager Services
New Construction
Post-Bid
Benton, AR

Academics Plus Maumelle Charter HVAC Ionization Upgrades
Renovation
Post-Bid
Maumelle, AR 72113

Palestine-Wheatley School District Baseball Concession/Restrooms
New Construction
Post-Bid
Palestine, AR

Construction of the Perryville School District Safe Room Utilizing Construction Manager
New Construction
Post-Bid
$1,527,443 est. value
Perryville, AR

New Elementary School And New Arena
New Construction
Post-Bid
Warren, AR

Baseball and Softball Dugout Additions
Addition, Infrastructure, Alteration
Post-Bid
Cabot, AR

Elementary Classroom Addition
Addition, Alteration - 8,000 SF
Post-Bid
Scranton, AR 72863

Last Updated 10/14/2022 12:32 PM
Project Title

First Ward School into a Homeless Shelter

Physical Address View project details and contacts
City, State (County) Pine Bluff, AR 71601   (Jefferson County)
Category(s) Education
Sub-Category(s) Elementary School
Contracting Method Competitive Bids
Project Status Bidding, Request for Qualifications, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Qualifying Contractors to perform work necessary for the renovation and conversion of First Ward School into a Homeless Shelter. The City of Pine Bluff reserves the right to reject any or all bids and waive any irregularities or formalities in bid responses.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents