Similar Projects
Page Hall Renovation
Renovation, Alteration - 31,000 SF
Design
Raleigh, NC 27695

Z2DA--Install Emergency Power for HVAC
Term Contract
Design
$1,000,000 to $2,000,000 est. value
Durham, NC 27705

Gas Water Heater and HVAC Venting Replacements
Alteration
Bidding
Raleigh, NC 27604

Fan Coil Unit
Alteration
Bidding
Durham, NC

HVAC Repairs and Maintenance
Term Contract
Post-Bid
Durham, NC 27701

Parkwood Elementary School Chiller Replacement
Post-Bid
Durham, NC 27713

911 Emergency Communication Backup Facility Hvac
Results
Durham, NC 27704

Cooler and Freezer Restoration at Durham County Detention Center
Term Contract
Results
Durham, NC 27701

Replace Make-Up Air Units at Durham County Stadium
Post-Bid
Durham, NC 27704

Administration Building AHU Replacement
Results
$276,915 est. value
Durham, NC 27701

Indoor Air Quality
Post-Bid
Durham, NC 27701

Fayetteville Street Elementary School Boiler and Chiller Replacement
Results
Less than $562,000 est. value
Durham, NC 27707

Dabney Hall Phase 3, 8th Floor HVAC Renovations
Alteration
Post-Bid
Raleigh, NC

Z2DZ--Renovate and Replace Pharmacy AHUs
Results
$1,000,000 to $5,000,000 est. value
Durham, NC 27705

Easley Elementary Boiler Replacement Project
Results
Durham, NC 27712

Reported 11/04/2021 12:00 AM
Project Title

Donald W Eaddy Building - HVAC and Lab Exhaust Upgrades and Repairs

Physical Address View project details and contacts
City, State (County) Raleigh, NC   (Durham County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value $1,600,000
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Ultimate goal of the project is to find a permanent solution to resolve the temperature and humidity issues for the lab spaces which would allow the lab equipment and associated processes to operate within specific tolerances. Scope of work to include: 1. Provide load study and use that information to design and install new HVAC and Controls Building renovation. 2. Remove and replace existing lab exhaust fans. Certify fume hoods. 3. Test and balance airflows in entire facility once work is completed.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents