Similar Projects
Coastal Seafood
New Construction, Addition - 8,270 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Woolford, MD 21677

Seagirt Marine Terminal
Conception
$32,800,000 est. value
Baltimore, MD

Main Deck Replacement at ELMS Environmental Educational Center
Post-Bid
Less than $49,999 est. value
Lexington Park, MD 20653

Request for Information (RFI) Impact Pile Driving
Post-Bid
Patuxent River, MD

Replacement at Inspiration Lake
Results
Gaithersburg, MD 20878

Pier 10 Landside Stabilization at North Locust Point Marine Terminal - SBR Only
Results
$1,000,000 to $2,500,000 est. value
Baltimore, MD 21202

Four Seasons at Kent Island Phase II
New Construction - 26,566 SF
Construction
Centreville, Chester, MD 21619

Living Shoreline, Erosion Control, Kayak Launch And Stone Bulkhead & Improvements
Renovation
Pending Verification
Arnold, MD

Bulkhead, Piers, Pilings, and Boat Lifts
Renovation
Pending Verification
Annapolis, MD 21403

Removal of Derelict or Abandoned Boats in Choptank Marina
Post-Bid
Denton, MD

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

Bulkhead Replacement
Renovation
Pending Verification
Annapolis, MD

Deck Replacement Deep Creek Lake State Park
Alteration
Post-Bid
Less than $50,000 est. value
Swanton, MD 21561

Berth 11 and 12 Deck Upgrades Phase II at Dundalk Marine Terminal
Results
$10,000,000 to $15,000,000 est. value
Baltimore, MD 21222

Lafayette Park Pier Replacement
Results
Annapolis, MD 21401

Last Updated 09/07/2021 01:18 PM
Project Title

Construction/Installation of Floating Dock at Tuckahoe State Park

Physical Address View project details and contacts
City, State (County) Queen Anne, MD 21657   (Queen Annes County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $100,000 to $500,000
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of construction and installation of: 1. Prefabricated floating dock for the launching of kayaks meeting ADA requirements. 2. Prefabricated floating dock for fishing meeting ADA requirements. 3. Aluminum gangways with ADA railings. 4. Striping existing parking lot 5. Asphalt trail 6. Planting 7. Erosion and sediment control measures 8. Stabilization of disturbed areas

Details

Division 31 - Earthwork.
Division 32 - Exterior Improvements.
Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents