Similar Projects
South 19 Avenue Aparments
New Construction, Infrastructure - 13,120 SF
Design
$6,800,000 CJ est. value
Hollywood, FL 33020

South 19 Avenue Aparments
New Construction, Infrastructure - 13,120 SF
Design
$6,800,000 CJ est. value
Hollywood, FL 33020

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Asphalt and Sidewalk Rehabilitation
Infrastructure
Results

Asphalt and Sidewalk Rehabilitation
Infrastructure
Results

RFP D/B - Design and Construction of Zone 3 - WEG HQ/Maintenance Hangar and Apron Facilities
New Construction, Infrastructure - 211,419 SF
Construction
$195,651,603 CJ est. value
Tyndall AFB, FL 32403

Chipola River Solar Energy Center
Infrastructure
Pending Verification
$91,337,000 CJ est. value
Clarksville, FL 32430

Flowers Creek Solar Energy Center
Infrastructure
Pending Verification
$90,741,000 CJ est. value
Clarksville, FL 32430

RFP - Continuing Services Traffic Operations Design Consultant
Term Contract
Post-Bid
$5,000,000 CJ est. value
Santa Rosa Beach, FL 32459

Silicone Joint Sealer
Infrastructure
Results

RFP - D/W Traffic Safety Studies and Minor Design
Term Contract
Post-Bid
$1,500,000 CJ est. value
Vernon, FL 32462

Asphalt Maintenance-Districtwide Maintenance
Infrastructure
Post-Bid
$500,000 est. value

Automated Weather Observation Station (AWOS) III PT Replacement at Calhoun County Airport
Infrastructure
Post-Bid
$580,000 CJ est. value
Altha, FL 32421

Replacement Hospital for Calhoun Liberty Hospital
New Construction, Infrastructure
Post-Bid
$59,960,000 CJ est. value
Blountstown, FL 32424

Last Updated 05/25/2023 10:29 AM
Project Title

FEMA Civil Construction Project

Physical Address View project details and contacts
City, State (County) Blountstown, FL 32424   (Calhoun County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Shoreline/Erosion/Drainage, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected March 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $5,000,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

**As of September 14, 2022, No responses were received. No definite date for the rebid.** This project shall consist of repairs to various locations around the City of Blountstown to address damage from Hurricane Michael. Repairs will include removing and replacing aluminum handrails, reflectors, concrete sidewalks, concrete slabs, concrete pavement, concrete encasement on pipe culverts, asphalt, sub-base asphalt, binder asphalt, surface asphalt, fill dirt, corrugated metal pipe, corrugated metal pipe debris removal, concrete headwalls, concrete drain inlets, aluminum tube cable rails with poles, and galvanized metal guardrails. The bid must conform to Section 287.133(3) Florida Statutes, on public entity crimes. Completion date for this project will be 90 days from the date of the Notice to Proceed presented to the successful bidder. Liquidated damages for failure to complete the project on the specified date will be set at $200.00 per day. Please indicate on the envelope that this is a sealed bid for the Blountstown FEMA Civil Construction Project. The bid will be awarded to the lowest responsive bidder at the City Council Meeting on August 9, 2022. The City of Blountstown reserves the right to reject any and all bids. All Bids shall remain firm for a period of sixty days after the opening. All bidders shall comply with all applicable State and local laws concerning licensing registration and regulation of contractors doing business to the State of Florida.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents