Similar Projects
Highway - Brine Building Facility Bids
New Construction, Infrastructure - 2,100 SF
Bidding
$250,000 CJ est. value
Dodgeville, WI 53533

2021 La Salle and Third Street Improvements
Infrastructure
Post-Bid
Rewey, WI

HHS - Parking Lot 2021
Infrastructure
Post-Bid
Dodgeville, WI 53533

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

2021 Infrastructure Improvements
Results
Less than $1,250,000 est. value
Ridgeway, WI 53582

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Water Quality Trading Clearinghouse
Infrastructure
Post-Bid

2021 Street Reconstruction
Results
Dodgeville, WI 53595

Seal Coat and Wedging on Township Roads
Infrastructure
Post-Bid
Avoca, WI

Dodgeville - Hollandale, Diamond Oaks Drive to CTH K
Infrastructure
Results
Dodgeville, WI 53595

Seal Coat
Infrastructure
Post-Bid
$200,000 est. value
Barneveld, WI

Asphalt Maintenance Milling STH 23
Infrastructure
Results
Dodgeville, WI

Spring Green - Madison, Wisconsin River to Oak Street
Infrastructure
Post-Bid
$2,000,000 to $2,999,999 est. value
Dodgeville, Madison, WI 53595

County Highway Improvement CTH N (CTH NN – STH 133)
Infrastructure
Results
WI

Last Updated 10/10/2022 07:31 AM
Project Title

Cobb - Avoca, USH 18 to Kennedy Street

Physical Address View project details and contacts
City, State (County) Highland, WI 53543   (Iowa County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $4,000,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Cobb - Avoca, USH 18 to Kennedy Street; Iowa County; 5939-00-70; STH 80; 6.652 Miles; Base, HMA Pavement, Asphaltic Surface, Curb and Gutter, Sidewalk, Beam Guard, Culvert Pipe, and Pavement Marking. DBE Goal: NA Estimated Range $3,000,000 - $3,999,999 With each sealed proposal, the bidder must include a properly executed bid bond or a cashier's check, certified check, bank's check, or postal money order in the amount designated on the Highway Work Proposal made payable to the Department. Certified checks shall be drawn on the account of the bidder submitting the proposal. The bidder may also satisfy the proposal guaranty requirements by having a properly executed annual bid bond on file with the Department. Contractors should submit all questions concerning plans and/or proposals through Website. This process is documented and can be found at Website. WisDOT - 02 - Cobb - Avoca, USH 18 to Kennedy Street *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents