Similar Projects
Woodville Road Widening Phase 1 - Old Hearne to Texas Avenue - ST_ 15_ 001 - City of Bryan
Infrastructure
Conception
$5,440,000 CJ est. value
Bryan, TX 77803

Woodville Road Widening Phase 1 - Old Hearne to Texas Avenue - ST_ 15_ 001 - City of Bryan
Infrastructure
Conception
$5,440,000 CJ est. value
Bryan, TX 77803

Villa Maria C Store
New Construction, Infrastructure - 3,971 SF
Design
$1,000,000 CJ est. value
Bryan, TX 77807

Hansen-Zak
New Construction, Infrastructure
Design
$3,000,000 CJ est. value
Bryan, TX 77801

Dowling Road Pump Station (DRPS) to Wellborn Road Water Line Rehabilitation - City of College Station
Infrastructure
Bidding
$6,340,000 CJ est. value
College Station, TX 77840

College Heights Utility Rehabilitation - City of College Station
Infrastructure
Bidding
$3,720,000 CJ est. value
College Station, TX 77840

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

BTU Administration Office
New Construction, Infrastructure - 37,000 SF
Post-Bid
$20,000,000 CJ est. value
Bryan, TX 77808

SH0021 - Snow and Ice Control
Term Contract
Results
$58,500 est. value
TX

JP/Constable Precinct 1 Building Site Work
Infrastructure
Results
$605,021 est. value
TX

Dutch Bros Coffee - University Drive (TX0305) / College Station
New Construction, Infrastructure - 930 SF
Construction
$500,000 CJ est. value
College Station, TX 77840

Reece Homes
New Construction, Infrastructure - 8,359 SF
Construction
$1,600,000 CJ est. value
Bryan, TX 77802

Pine Ridge Apartments
New Construction, Infrastructure - 13,571 SF
Pending Verification
$1,500,000 CJ est. value
College Station, TX 77840

Crossway Auto Center
New Construction, Infrastructure - 2,903 SF
Pending Verification
$246,755 CJ est. value
Bryan, TX 77808

Old Hearne Reconstruction (Wilkes to Woodville) Phase 3 and 5 - ST_ 11_ 002/ST_ 11_ 003 - City of Bryan
Infrastructure
Conception
$4,400,000 CJ est. value
Bryan, TX 77803

Last Updated 01/18/2023 05:34 PM
Project Title

Gateway Monument Signs Phase 1

Physical Address View project details and contacts
City, State (County) Bryan, TX 77803   (Brazos County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $350,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Question Deadline via ionwave: December 14, 2022 Location: The Project has 2 work locations: (1) near the intersection of Fazzino Lane and SH 21 on south side of SH 21 located on the TAMU RELLIS Campus within an easement and (2) near intersection of Deer Hill Dr. on SH 6 between southbound frontage road and main lanes within TXDOT Right of Way in Bryan, TX. The City anticipates the scope of work for the Project to consist of the following responsibilities and the following items: Coordinate all construction activities per TXDOT requirements to ensure a safe construction site. Construct gateway monument sign at Highway 6 location Construct gateway monument sign at Highway 21 location Install all necessary electrical conduit and wiring to power the lighted signs Clean up site and coordinate with Owner to establish vegetation on all disturbed areas All other appurtenances necessary to complete the Project.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents