Similar Projects
Crossing at the Lake
New Construction, Infrastructure - 41,282 SF
Conception
$11,000,000 CJ est. value
Nashville, TN 37013

Kickback Jack's Restaurant
New Construction, Infrastructure
Conception
$1,000,000 CJ est. value
Alcoa, TN 37701

Storyville Gardens Phase 1
New Construction, Infrastructure
Design
$300,000,000 CJ est. value
Nashville, TN 37219

The Sinclair Tower
New Construction - 39,000 SF
Design
$1,250,000 est. value
Nashville, TN 37203

Walmart Supercenter #685.255 Special Project / Morristown
Renovation
Bidding
$100,000 CJ est. value
Morristown, TN 37813

Walmart Supercenter #698.258 Special Project / Cleveland
Renovation
Bidding
$100,000 CJ est. value
Cleveland, TN 37312

Bedford Country Higher Education Center for Tennessee College of Applied Technology (TCAT) - Shelbyville
New Construction, Infrastructure - 105,000 SF
Post-Bid
$5,000,000 CJ est. value
Shelbyville, TN 37160

Dutch Bros. Coffee
Renovation - 950 SF
Post-Bid
Nashville, TN 37207

Vocational Classroom Renovation
Renovation
Results
$200,000 est. value
Jellico, TN 37762

One22One
New Construction - 380,229 SF
Construction
$10,000,000 CJ est. value
Nashville, TN 37203

The Landings River North Development
New Construction
Construction
$265,000,000 est. value
Nashville, TN 37207

Yassin Falafel Waffle House
New Construction
Pending Verification
Maryville, TN

Chief's Bar & Restaurant
New Construction
Pending Verification
Nashville, TN 37201

Bottled Blonde / Nashville
New Construction, Infrastructure - 25,000 SF
Design
$20,000,000 CJ est. value
Nashville, TN 37201

Dutch Bros TN0204 - Elm Hill Pike / Nashville
Demolition, New Construction - 950 SF
Bidding
$500,000 CJ est. value
Nashville, TN 37214

Last Updated 06/29/2023 02:08 AM
Project Title

Career Technical Education Annex Vocational Building Culinary Kitchen Renovation

Physical Address View project details and contacts
City, State (County) Shelbyville, TN 37160   (Bedford County)
Category(s) Commercial, Education
Sub-Category(s) Food/Beverage Service, Vocational School
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Interior renovation to the existing culinary kitchen and classroom and to replace all kitchen equipment and provide new ceilings, lighting, ductwork, exhaust hood, and new floor and wall finishes. Bid bond or Certified Cashier's Check, made payable to Bedford County, in the amount of 5% of the total bid. The bond is required as a guarantee that if the bid is accepted, a contract will be entered into. Refer to bid documents for complete bidding instructions. A Payment, Performance, Labor and Materials (PPLM) Bond in the amount of 100% of the contract sum issued by a bonding company licensed to do business in the State of Tennessee and acceptable to the Owner. An apparent low Bidder will be established from this bid process. Contracts for this project will be awarded to the lowest, best, and most responsive bid that reasonably meet specifications and qualifications. Immediately after bid opening, Bedford County will prepare a bid tabulation. The Bedford County Finance Department along with Kline Swinney Associates will review the bid tabulations. An apparent low bidder will be chosen, the Kline Swinney Associates will provide to Bedford County a written (documented) recommendation of who the winning bid should be awarded to. Bedford County Purchasing will release the bid tabulations noting the apparent low bidder to all participants of the bid. Approximately ten (10) consecutive days after the tabulations are released, Bedford County will issue a fully funded award PO to the low bidder. All Bedford County bids are ultimately subject to funding. Furthermore, Bedford County reserves the right to waive any informality or to reject any or all bids that are not in the best interest of Bedford County.

Details

2 Stories Above Grade, 74,114 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Resilient Flooring, Carpeting, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Refrigerated Display Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Office Furniture, Institutional Furniture, Classroom Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents