Similar Projects
Waukesha Water Utility - Contract Package 3
Bidding
Waukesha, WI

2021 Water Main Relay
Bidding
Less than $1,500,000 est. value
Brookfield, WI

Manhattan Drive Water Main Replacement
Post-Bid
$395,000 est. value
Menomonee Falls, WI 53051

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

County Line Road Sanitary Sewer and Water Main Conversion
Results
$1,800,000 to $2,100,000 est. value
Menomonee Falls, WI 53051

2021 Street Projects 47
Results
Less than $2,000,000 est. value
Oconomowoc, WI

Lawndale Avenue, Fairmont Avenue and Caldwell Street Utility and Street Improvements
Renovation
Results
Waukesha, WI 53188

Jacobson Drive Water Main Relay
Results
Less than $450,000 est. value
Menomonee Falls, WI 53051

2021 Thackeray Trail Reconstruction
Results
Oconomowoc, WI 53066

Perkins Avenue Utility and Street Improvements
Results
Waukesha, WI 53186

N & S Prairie Avenue, Sentry Drive and West Sunset Drive Utility and Street Improvements
Results
Waukesha, WI 53146

Blackfoot Drive Water Main Relay, Storm Sewer and Street Reconstruction
Results
Less than $575,000 est. value
Menomonee Falls, WI 53051

Oxford Road, Downing Drive, Algoma Terrace, Rawlins Drive and Badger Drive Utility and Street Improvements
Results
Waukesha, WI 53186

2021 Utilities Program
Results
$250,000 est. value
Hartland, WI 53029

2021 Water Main Extension
Results
Brookfield, WI

Last Updated 12/18/2020 11:46 AM
Project Title

Waukesha Water Utility - Contract Package 2B

Physical Address View project details and contacts
City, State (County) Waukesha, WI   (Waukesha County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Work comprises furnishing all labor, materials, equipment, supplies and services for the following: Approximately 2.19 miles of new Return Flow Pipeline from the connection to Contract Package 5 located southeast of the intersection of Les Paul Parkway and Sunset Drive in the City of Waukesha to the connection with Contract Package 5 located southeast of the intersection of Racine Avenue and Swartz Road in the City of New Berlin. Approximately 1,490 linear feet of new BPS Discharge Pipeline from the connection to Contract Package 3 located at 2010 East Broadway in the City of Waukesha to the connection to the WWU Distribution System located northwest of the intersection of Les Paul Parkway and Broadway in the City of Waukesha. Approximately 2.71 miles of new Water Supply Pipeline from the connection to Contract Package 3 located at 2010 East Broadway in the City of Waukesha to the connection with Contract Package 2A located northeast of the intersection of Coffee Road and Swartz Road in the City of New Berlin. Work for the above pipeline segments includes open-cut construction of pipelines comprised of ductile iron pipe, jacking and boring steel casings, horizontal directional drilling high density polyethylene pipe for fiber optic cable, isolation valves, blow-off assemblies, air valves, fittings, vaults, cathodic protection, testing, traffic control, erosion and sedimentation control, fiber optic, connections to other Contract Packages and existing infrastructure, restoration of roadway, landscape, and other existing infrastructure, obtaining and complying with permits, startup, commissioning, training, and other appurtenant Work as shown and specified in the Contract Documents titled Contract Package 2B.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents