Similar Projects
Acequia Trail Extension from Rufina Street to San Felipe Road
Infrastructure
Bidding
Santa Fe, NM

2022-2023 Annual Maintenance Contract A
Term Contract, Infrastructure
Bidding
Roswell, NM

Administrative Complex Parking Lots and Sheep Springs Way Improvement
Post-Bid
Jemez Pueblo, NM 87024

On Call Construction Services for Public Works
Term Contract
Post-Bid
Less than $2,500,000 est. value
Los Alamos, NM 87544

Construction of the Tyrone Townsite ADA Improvements
Results
Silver City, NM

Visitors Center Pedestrian and Trailhead Improvements NMDOT Highway Safety Improvements Program
Results
Silver City, NM 88061

Alameda Drain/2nd Street Bike/Ped Trail Phase 3
Infrastructure
Bidding
Albuquerque, NM

NM FTFW RIMO 10(1) Rio Mora National Wildlife Refuge Road & Visitor Parking Rehab
Post-Bid
$1,500,000 to $2,500,000 est. value
Watrous, NM

Eva B Stokely Elementary Asphalt Parking Lot
Results
Shiprock, NM 87420

New Mexico Main Street Railroad Parking Lot Project
Infrastructure
Bidding
Clovis, NM

Quartz Hill Trail Project
Post-Bid
NM

San Ysidro Walkway
Results
San Ysidro, NM 87053

Telshor Avenue ADA Improvements Phase V
Post-Bid
Las Cruces, NM 88011

Coal Avenue Event Street Project
Results
Gallup, NM 87301

Sunport Boulevard Extension
Infrastructure
Post-Bid
Albuquerque, NM 87196

Last Updated 10/11/2021 03:23 PM
Project Title

Taos Public Health Office Parking Lot Sidewalk Project

Physical Address View project details and contacts
City, State (County) Taos, NM 87571   (Taos County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $177,214
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor shall provide all labor and materials to construct the Taos Public Health Center Parking Lot and Sidewalk Project. The project is within the Town of Taos located at the Taos Public Health Office, 1400 Weimer Road Taos, New Mexico. The project consists of pavement pulverization, grade control and re-grading and compaction of pulverized sub-base, new Hot Mix Asphaltic Concrete, concrete curb and gutter, concrete drive pad parking placement, minor parking lot striping, concrete valley gutter improvements and sidewalk reconstruction and removals. All work shall meet applicable local, state, and federal regulations and laws.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents