Similar Projects
Reconstruct East B Hill Road - Paving - Oxford County
Infrastructure
Conception
$250,000 CJ est. value
Newry, ME 04261

Reconstruct East B Hill Road - Paving - Oxford County
Infrastructure
Conception
$250,000 CJ est. value
Newry, ME 04261

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Plowing in Public Ways
Infrastructure
Post-Bid
Waterford, ME

Highway Rehabilitation
Results
Woodstock, ME 04219

2021 Roadway Paving
Infrastructure
Results
Oxford, ME

Replace Meadowbrook Bridge - Oxford County
Demolition, New Construction, Infrastructure
Conception
$750,000 CJ est. value
Norway, ME 04268

Roberts Farm Preserve Sitework
Infrastructure
Post-Bid
$400,000 est. value
Norway, ME 04268

Paving
Infrastructure
Results
Hartford, ME

ACAD- Repair Storm Damaged Bike Paths
Term Contract
Results
$25,000 to $100,000 est. value

Statewide Geotechnical Drilling
Infrastructure
Results

Hut Road Intersection Improvement
Infrastructure
Results
Stoneham, ME 04231

Construction Manager/General Contractor(CM/GC)Preconstruction Services for the Western Maine Paving Bundle/The Paving Bundle
Infrastructure
Results
Bethel, Greenwood, Peru, Woodstock, ME

Stanley Hill Road Paving
Infrastructure
Results
Fryeburg, ME 04037

2022 Roadway Paving
Infrastructure
Results
Paris, ME

Last Updated 09/23/2022 10:31 PM
Project Title

F2T Trail Project - Phase IV and Final Phase

Physical Address View project details and contacts
City, State (County) Norway, ME 04268   (Oxford County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status Bidding, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Owner's Representative
Owner View project details and contacts
Architect View project details and contacts
Description

Roberts Farm Preserve Farm to Town Trail Project Phase IV: The Western Foothills Land Trust (WFLT) is requesting proposals for work to construct the fourth and final phase of the Farm to Town Trail linking our trails at Roberts Farm Preserve to a trailhead parcel on Water Street, Norway, Maine. This phase of the project is being funded by a Federal Highway grant through the Recreation Trails Program (Project No RTP2151) managed by State of Maine, Bureau of Parks and Lands and by private sources. The project entails the construction of a trail for Nordic skiing. The length of proposed trail section is 2900' feet and an additional 300' for a relocation. Minimum corridor width is 14 feet and a prepared tread surface width of 12 feet, and 14 feet on slopes with more than 10% grade Minimum grade runs at 3%, and the maximum grade is about 15%. The route has two 200' sections where the side slopes are 30%. The trail requires placing four culverts and constructing two platform bridges. WFLT reserves the right to accept any or reject any or all proposals for any reason.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents