Similar Projects
Juniper Ridge Public Works Administration, Lab, and Warehouse - FA25AX - City of Bend
New Construction, Infrastructure
Conception
$48,804,000 CJ est. value
Bend, OR 97703

Pool Deck Re-Surface - City of Forest Grove
Infrastructure
Conception
$250,000 CJ est. value
Brothers, OR 97712

Cottages on Helmholtz
New Construction, Infrastructure
Design
$32,800,000 CJ est. value
Redmond, OR 97756

US97: Multi-Use Trail (Baker Rd. - Lava Butte)
Infrastructure
Design
$4,677,000 CJ est. value
Bend, OR 97707

Fourth Plain Sewer Improvements
Infrastructure
Bidding
$736,014 CJ est. value
Brothers, OR 97712

Fourth Plain Sewer Improvements
Infrastructure
Bidding
$736,014 CJ est. value
Brothers, OR 97712

RFP Construction Manager - Redmond Municipal Airport Terminal Building Expansion Project
Addition, Demolition, Infrastructure
Post-Bid
$200,000,000 CJ est. value
Redmond, OR 97756

ESB Klamath Falls Mile Marker Replacement Rebid
Infrastructure
Post-Bid
$250,000 CJ est. value
Bend, OR 97703

Odem Medo - Salmon Avenue Realignment Plan
Infrastructure
Results
$1,050,000 est. value
Redmond, OR

Region 4 Arts
Infrastructure
Results
$3,333,633 CJ est. value
La Pine, OR 97739

New Stevens Ranch Library - Deschutes County
New Construction, Infrastructure
Pending Verification
$113,000,000 CJ est. value
Bend, OR 97703

Sunset Meadows
New Construction, Infrastructure
Pending Verification
$26,000,000 CJ est. value
Sisters, OR 97759

Brosterhous and Chase Intersection - 1TCHI - City of Bend
Infrastructure
Conception
$1,000,000 CJ est. value
Bend, OR 97702

US 97: Lower Bridge Way - NW 10th St (Terrebonne)
Infrastructure
Design
$22,600,000 CJ est. value
La Pine, OR 97739

Bend Armory Pov Parking Lot Upgrade
Infrastructure
Bidding
$400,000 CJ est. value
Bend, OR 97702

Last Updated 06/08/2023 11:28 AM
Project Title

Pilot Butte Distribution Improvements - 1WPDI - City of Bend

Physical Address View project details and contacts
City, State (County) Bend, OR 97701   (Deschutes County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected July 2024
Bids Due View project details and contacts
Estimated Value $14,800,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Installation of new and upsized waterline piping in addition to condition related improvements of existing facilities in the Pilot Butte vicinity. Improvements will increase fire flow availability, upsize and improve pipe condition, and extend useful life. Identified projects from the Integrated Water System Master Plan (iWSMP) include FFP-21 Pilot Butte and Neff Road Upsize, P-19 6th Street Upsize, FFP-17 Highway 20 Looping, and Miscellaneous Pipe Replacement Segments in the area. This project is included in the city's 2022-2026 Capital Improvement Plan (CIP). As of June 8, 2023, per owner, there’s been no movement on the Pilot Butte project, design or construction related. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents