Similar Projects
Kitchen and Piping Upgrades at Nottingham High School
Renovation
Bidding
Hamilton Township, NJ 08619

Kitchen Renovations at Hamilton High School West
Renovation
Post-Bid
Trenton, NJ 08610

Renovations and Alterations at Multiple Schools at Hamilton Township School District
Renovation
Post-Bid
Hamilton Township, Trenton, NJ 08619

Alterations at the John Witherspoon Middle School
Renovation, Addition
Results
$3,824,500 est. value
Princeton, NJ 08540

Locker Room Alterations at Hightstown High School
Renovation
Results
$798,000 est. value
Hightstown, NJ 08520

Addition and Renovations to Thomas Grover Middle School
Renovation, Addition
Construction
$8,100,000 est. value
West Windsor, NJ

Renovations and Alterations at Multiple Schools at Hamilton Township School District
Renovation
Post-Bid
Hamilton, NJ

Culinary Arts Classroom Alterations at Hightstown High School
Renovation
Results
$786,000 est. value
Hightstown, NJ 08520

General Construction: Time and Materials
Post-Bid
Lawrenceville, NJ 08648

Various Rehabilitation Projects, Security Vestibules and Toilet Room Renovations at Various Schools
Results
Less than $1,550,000 est. value
West Windsor, NJ

Fire Alarm: Time and Materials
Post-Bid
Lawrenceville, NJ 08648

Exterior Renovations at the Entrances to the Robbinsville High School
Renovation
Results
Robbinsville, NJ 08691

Toilet Room Renovations for Nottingham High School
Renovation
Post-Bid
Hamilton Township, NJ 08619

Alterations and Additions at the Princeton High School
Renovation, Addition
Results
Princeton, NJ 08540

Gymnasium and Locker Room Renovations at Ewing High School Fisher Middle School
Renovation
Results
$5,400,000 est. value
Ewing, NJ 08618

Last Updated 02/16/2021 08:57 AM
Project Title

Additions, Alterations and Renovations at Northern Burlington County Regional High School - Phase 2

Physical Address View project details and contacts
City, State (County) Trenton, NJ 08618   (Mercer County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method
Project Status Construction Commenced first quarter 2020
Bids Due View project details and contacts
Estimated Value $925,000 to $10,750,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Contract No. 1 – General Construction Work (C009) (est. $10,750,000) Contract No. 2 – Structural & Miscellaneous Steel Work (C029) (est $925,000) Contract No. 3 – HVACR Work (C032) (est $4,230,000) Contract No. 4 – Plumbing Work (C030) (est 1,620,000) Contract No. 5 – Electrical Work (C047) (est 2,825,000) Contract No. 6 – Combined Single Overall Contract comprising Contracts 1 though 5 Estimated Project Cost: General Construction $10,750,000; Structural Steel $925,000; Plumbing $1,620,000; HVACR $4,230,000; Electric $2,825,000 The work consists of additions, alterations and renovations to the East and West buildings, as well as Site Work including an extension of an entry driveway, small parking lot expansion with curbing, new site lighting, new concrete plaza/sidewalks/ramp, landscaping, sump pump, storm sewer system, manholes, site signage, bollards, fencing, retaining walls, concrete steps & handrails, flagpole, utility services and other related work indicated on the contract documents. Additions to the East and West buildings of the school with the primary purpose of connecting the two buildings, consist of the following spaces: The main connector addition will consist of a new Main Lobby, Cafeteria Expansion, Passageway, Kitchen, Kiosks, School Store & Office, (2) Business Classrooms, Office, Janitor’s Closet, Library/Media Center, SGI, Maker Space, Toilet Rooms, IDF Room, Work Room, Receiving/Bldg. Storage, Freezer, Faculty Dining, Nurse’s Suite, Faculty Planning Room, Main Office Area/Administrative Offices, Conference Room, Vestibules and Corridors. This addition will also include and small second floor mezzanine with a new Conference Room, Archive Storage, and Electrical Rooms. There is also an alternate bid to add another Business Classroom to this addition. A second small addition on the East building will include Agriculture Mechanical Welding and Engineering Shops, Agriculture Tool & Storage Room, Compressor Room, Wood Storage, Finish Room and a vestibule. Alterations and Renovations include creation of a new Industrial Design/Engineering Classroom, Fabrication Room, Student Project Storage Room, Robotics/Engineering Classroom, Fine Arts 3D Classroom, Kiln Room, Art Storage, Fine Arts 2D Classroom, Agriculture Classrooms, Applied Tech. Wood Shop, Wood Storage, Spec. Ed Classroom, English General Classrooms, Business Classroom, G&T Classroom, Dept. Work Room, MDF room, new Corridors, Offices, Storage, Science Labs and associated Prep Room. There will also be additional alterations to the existing building at the connection points of the new additions.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 10 - Specialties, Signage.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications.
Division 32 - Exterior Improvements.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents