Similar Projects
Construction Services for the James A. Byrne US District Court Clerk’s Office Project
Design
$5,000,000 to $10,000,000 est. value
Philadelphia, PA 19106

Monroe County Courthouse Expansion Project
New Construction, Renovation - 160,700 SF
Bidding
$58,000,000 est. value
Stroudsburg, PA 18360

New Municipal Complex
New Construction - 16,560 SF
Bidding
Sanatoga, PA 19464

Repointing of Courthouse and Family Court Center
Post-Bid
Washington, PA 15301

Fayette County Courthouse Conference Room Expansion - General Construction
Post-Bid
Uniontown, PA 15401

Lancaster County Courthouse MEP Infrastructure 5th Thru 7th Floors Renovations & Alterations
Renovation, Addition
Results
Lancaster, PA 17603

Franklin County Judicial Center- Administration Building
New Construction - 35,349 SF
Results
$9,000,000 to $15,000,000 est. value
Chambersburg, PA

Construction of the Lackawanna County Criminal Justice Center
Addition - 13,800 SF
Construction
Scranton, PA 18503

Centre County Courthouse Renovation
Renovation
Construction
Bellefonte, PA 16823

Courthouse 2nd Floor Office Suite Renovation
Renovation
Post-Bid
Wilkes-Barre, PA 18711

Interior Modifications for the Monroe County Public Defender`s Office and Pre-Trial Services
Renovation - 4,695 SF
Results
$100,000 est. value
Stroudsburg, PA 18360

Montour County Administrative Offices - Courthouse Renovations - Jail Visitor's Center
- 29,620 SF
Construction
Danville, PA

Fairground Exhibit Hall 3 - Design/Build Rehabilitation
Post-Bid
Washington, PA 15301

City Hall Room 900 Interior Improvements - General
Results
$500,000 to $1,000,000 est. value
Philadelphia, PA 19107

Temporary Family Court Room Relocation - General
Renovation - 23,900 SF
Construction
Norristown, PA 19401

Last Updated 03/31/2021 08:20 AM
Project Title

Proposed Security Renovations at UTMA Office Building

Physical Address View project details and contacts
City, State (County) Greensburg, PA 15676   (Westmoreland County)
Category(s) Government/Public
Sub-Category(s) Capitol/Court House/City Hall
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work consists of complete renovations and modifications to the existing office building main entrance/vestibule, rear egress location and a corridor exit door location including selective demolition, ballistic wall and door construction, counter installation meeting, ADA requirements, exit door installations and one exterior door landing area.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Entrances, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents