Similar Projects
South 48Th Street Mini Storage
New Construction
Conception
$1,000,000 est. value
Springdale, AR 72762

Ellis Estates
New Construction, Infrastructure
Conception
$15,750,000 CJ est. value
Fayetteville, AR 72703

Chad Reed Storage Complex
New Construction - 22,000 SF
Design
Less than $1,000,000 est. value
Springdale, AR 72764

JA Riggs Facility Expansion
New Construction, Infrastructure - 10,112 SF
Design
$2,700,000 CJ est. value
Springdale, AR 72762

RFQ Contractor - Construct New Water Storage Facility
Demolition, New Construction, Renovation, Infrastructure
Bidding
$10,000,000 CJ est. value
Fayetteville, AR 72703

RFQ Construction Manager at Risk - CMAR for Lake Fayetteville Ballfield Renovations
Infrastructure
Bidding
$551,250 CJ est. value
Fayetteville, AR 72701

Washington County Jail Expansion
Addition, Infrastructure
Post-Bid
$116,000,000 CJ est. value
Fayetteville, AR 72701

Multi-User Silicon Carbide National Research Fabrication Laboratory (MUSiC Lab) - University of Arkansas-Fayetteville
New Construction, Infrastructure
Post-Bid
$23,000,000 CJ est. value
Fayetteville, AR 72701

Lee Creek Stream Restoration at Devil's Den State Park
Infrastructure
Results
$430,000 CJ est. value
West Fork, AR 72774

Highway 412 Water East Improvements
Infrastructure
Results
$3,069,050 CJ est. value
Tontitown, AR 72762

University of Arkansas Anthony Timberlands Center for Design and Materials Innovation
LEED Certification, New Construction, Infrastructure - 45,000 SF
Construction
$26,500,000 CJ est. value
Fayetteville, AR 72701

Lewis Automotive Mall
New Construction, Infrastructure - 89,946 SF
Construction
$20,000,000 CJ est. value
Fayetteville, AR 72704

Markham Cottages
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Fayetteville, AR 72701

Chandler Crossing
New Construction, Infrastructure
Pending Verification
$20,000,000 CJ est. value
Fayetteville, AR 72703

Nazareth Retreat Center - Phase 1
New Construction, Infrastructure - 13,112 SF
Conception
$3,375,000 CJ est. value
Fayetteville, AR 72701

Last Updated 02/14/2023 09:55 AM
Project Title

Nazareth Retreat Center - Phase 2

Physical Address View project details and contacts
City, State (County) Fayetteville, AR 72701   (Washington County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Site Development, Warehouse/Storage
Contracting Method Bids by Invitation
Project Status Conceptual Design, Construction start expected December 2023
Bids Due View project details and contacts
Estimated Value $1,500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of a new retreat center: Phase 1 consists of a 13,112 square foot retreat center with an outdoor pavilion, an office building, a splash park and pool Phase 2 consists of a 14,880 square foot boat storage complex Phase 3 consists of a zipline facility As of February 14, 2023, plans have not been submitted to the City of Springdale. Information regarding the selection of an architect and general contractor has not been provided. A firm timeline has not been determined.

Details

14,880 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents