Similar Projects
Roof Top Unit Replacement
Alteration
Bidding
Denver, CO 80221

General/Mechanical Prime Services of RTU Installation
Alteration
Bidding
Northglenn, Thornton, CO 80241

Noel Air Cooled Chiller Design Build
Post-Bid
Denver, CO 80239

KOA HVAC Upgrades
Post-Bid
Less than $160,000 est. value
Aurora, CO 80010

Dental School Improve Exhaust Fan EF-2 on Roof
Results
Less than $176,510 est. value
Aurora, CO 80045

HVAC R-22 Refrigerant Replacement Phase 2
Results
Denver, CO

Two (2) Reznor HVAC Units
Alteration
Bidding
Denver, CO

Infrastructure projects at the Southwest Memorial Hospital
Post-Bid
Cortez, CO 81321

Mariposa Roof Top Unit (RTU)-1 and Makeup Air Unit (MAU)-5 Replacement Project
Results
Denver, CO 80202

HVAC and Mechanical Products
Term Contract
Post-Bid

2020 HVAC and Controls Maintenance
Results
Westminster, CO 80031

Myec Zuni Parking Lot and HVAC
Post-Bid
Denver, CO 80211

Lab Fume Hoods
Results
Denver, CO 80229

HVAC Air Filter
Post-Bid
Denver, CO

J041--OCC-Data Center A/C Repairs Pop: 11-20-2020 To 11-19-2021
Results
Denver, CO

Reported 02/22/2022 12:00 AM
Project Title

Denver (DEN) NAS Equipment Building (NASEB) HVAC

Physical Address View project details and contacts
City, State (County) Denver, CO 80249 (Adams, Denver Counties)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

HVAC REPLACEMENT PROJECT The Work of Project is defined by the Contract Documents and consists of the following: 1. Replace three (3) 12.5 ton HVAC units at the DENA NASEB. The proposed units are Trane Voyager 2, or approved equal. The existing packaged units must be properly recycled. 2. Properly dispose of all refrigerants (R-22) and provide recycling receipts to the FAA. 3. Remove all existing exterior ductwork and replace with new ductwork. 4. Install new electrical components for HVAC the units including but limited to new Conductors, Conduit, Circuit breakers and GFCI outlets for servicing the new HVAC units. 5. Install a new lead/lag/stand-by HVAC controller. 6. All HVAC units, ductwork, electrical components, controllers, and any other items installed in this project must meet all relevant federal, state, local, and any other codes specified in the drawings and this statement of work

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents