Similar Projects
Corrections North and South Perimeter Security Buildings
New Construction
Conception
Orlando, FL 32839

Okeechobee County Sheriffs Department Jail Renovation and Expansion Project
Renovation, Addition
Design
$20,000,000 to $30,000,000 est. value
FL

Design-Build Services For Replacement Jail Site 1 - Training & Treatment Center
Bidding
Miami, FL

Pasco County Jail Expansion
Post-Bid
New Port Richey, FL 34654

DMS Gadsden Correctional Facility Dorm Renovations
Renovation
Post-Bid
Quincy, FL 32351

Police Department Shower Rehabilitation
Results
Less than $105,000 est. value
Davie, FL 33314

Building Management Services at TGK
Term Contract
Results
Medley, Miami, FL 33166

Columbia County Detention Facility
Construction
Jacksonville, FL

Columbia County Detention Facility
Construction
Jacksonville, FL

East Jail Control Rooms Renovation
Renovation
Results
Less than $100,000 est. value
Sarasota, FL 34237

Collier County Jail (J1) Kitchen Replacement and Safety Upgrades
Renovation
Results
Less than $1,800,000 est. value
Naples, FL 34112

Construction Management Services for Mental Health Renovations at Wakulla Annex & Santa Rosa Annex
New Construction, Renovation
Results
Less than $12,181,000 est. value
Crawfordville, FL 32327

Elevator Modernization at the Land O` Lakes Detention Center
Results
Land O' Lakes, FL 34637

John E. Polk Correctional Facility Kitchen Renovation Project
Renovation
Results
Less than $350,000 est. value
Sanford, FL 32773

Detention Center West - Portable Project
Renovation
Results
Tampa, FL 33614

Reported 04/28/2020 12:00 AM
Project Title

South County Jail Inmate Booths Renovations

Physical Address View project details and contacts
City, State (County) Frostproof, FL 33843   (Polk County)
Category(s) Government/Public
Sub-Category(s) Prison/Jail
Contracting Method Competitive Bids.
Project Status Sub-Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

This project includes the following scopes of work: Demolition, Masonry, Door Frames, Metal Doors, Hardware, Security Glazing, Framing/Drywall, Ceilings, Stucco, Floor Covering, Painting, Mechanical, Electrical, and Fire Protection.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents