Similar Projects
Olin Avenue Waste Transfer Tipping Room Floor Replacement
Renovation - 8,000 SF
Bidding
$60,000 CJ est. value
Madison, WI 53715

Floor Refinishing
Term Contract
Post-Bid
Milwaukee, WI

Tile and Flooring Replacement - Brewster Village
Alteration
Post-Bid
Appleton, WI 54914

M1QA--Refurbishing of Terrazzo Flooring at the Clement J Zablocki VAMC
Results
Milwaukee, WI 53295

Refinishing Gymnasium Floors
Term Contract
Results
Siren, WI

Flooring Replacement
Alteration
Post-Bid
New London, WI 54961

Newton - Flooring Replacement: GRECC
Term Contract
Results
Madison, WI 53705

Senior Center
Alteration
Post-Bid
Jefferson, WI 53549

Lasata Heights Apartments
Renovation, Alteration
Results
Cedarburg, WI 53012

Remove Carpet and Baseboard
Alteration
Post-Bid
Richland Center, WI

Building 3.1 Bid Package Flooring and Gypsum Board Assembly
Alteration
Results
Milwaukee, WI

Jail Open Pod Flooring and Painting Project
Alteration
Post-Bid
Oshkosh, WI 54901

Floor Resurfacing - Building 36
Alteration
Results
Milwaukee, WI 53216

Police Department Carpet Replacement
Alteration
Post-Bid
Sun Prairie, WI 53590

Wood Floor Refinishing Services
Alteration
Results
$200,000 est. value
Madison, WI

Last Updated 02/20/2023 10:16 AM
Project Title

Floor Covering Replacement - Exposition Center - State Fair Park

Physical Address View project details and contacts
City, State (County) West Allis, WI 53214   (Milwaukee County)
Category(s) Single Trades
Sub-Category(s) Flooring
Contracting Method Competitive Bids
Project Status Construction Commenced, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $218,169 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

In general, the work consists of: The replacement of the carpet floor coverings and vinyl base in the Exposition Center at the second floor of the building comprising the pre-function space, offices, meeting rooms, and conference room as well as 3 offices on the first floor. The 2 smaller meeting rooms on the second floor will receive new privacy window films at the interior glass dividing walls. The project also includes replacement of the epoxy flooring and toilet partitions in the 6 restrooms on the first floor. Contract offer and construction phase records will be processed electronically on the WisBuild(TM) DFD Information System. The 2017-2019 Wisconsin State Budget (2017 Wisconsin Act 59) repealed Wisconsin's prevailing wage laws. Effective September 23, 2017, state prevailing wage requirements on state building projects no longer apply These changes take effect for projects advertised for bid after September 23, 2017. This change does not affect the Federal Davis Bacon Act requirements.

Details

Division 09 - Finishes, Flooring.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents