Similar Projects
HVAC System Maintenance Services for CCSU
Bidding
New Britain, CT

Rooftop Air Handling Unit at Bristol Board of Education Administration
Bidding
Bristol, CT 06010

HVAC and Boiler Systems Preventative Maintenance Services 2019
Post-Bid
Hartford, CT

West Woods Upper Elementary School Dehumidification Project
Post-Bid
Farmington, CT

HVAC, Hartford, CT
Results
Hartford, CT 06110

Sales Booth HVAC (H)
Results
Hartford, CT 06141

BHS Exterior Ductwork
Bidding
Berlin, CT

HVAC Preventive Maintenance Services
Post-Bid
Hartford, CT

Air Handling Units (AHU) - 10 Humidifier Replacement
Results
Less than $96,206 est. value
Farmington, CT

HVAC Systems and Domestic Hot Water Upgrades
Post-Bid
Newington, CT 06111

HVAC Replacement Library for the Blind and Physically Handicapped
Results
Less than $500,000 est. value
Rocky Hill, CT

J045--PM Boiler Burners
Post-Bid
Newington, West Haven, CT

Design and Implementation of a Complete Water Treatment Program
Term Contract
Results
Enfield, CT 06082

Replacement of Air Conditioning Condensing Units at the Windsor Locks Public Library
Post-Bid
Windsor Locks, CT 06096

Wilson Fire Station Mechanical Upgrades
Results
Windsor, CT 06095

Last Updated 04/02/2021 10:27 AM
Project Title

High School Complete Commercial Pool Heater Replacement and Piping

Physical Address View project details and contacts
City, State (County) Plainville, CT   (Hartford County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

1. The complete demolition, removal, and legal disposal of the existing Lochinvar CopperFin2 CPN752 heater boiler. Demolition shall include all piping, valves, conduit, boiler supports, electrical wiring and devices, and associated hangers and mounts in the area of the boiler to the height of the ceiling. Ducting and/or vent piping shall be demolished to the interior of exterior wall penetration. Additionally, the contractor shall remove approximately 100’ of 2” Schedule 80 CPVC piping to the main distribution lines. Included in pipe demolition is all associated hangers, valves, unions, and sensors. All work is to be completed “wet” and removal of piping will need to be coordinated with temporary plugs, bladders, or methods to contain water while piping is removed and new valving is installed. Any substantial loss of water from the pool system must be refilled at contractor expense. The Town reserves the right to request to and retain any parts from the demolition, to be separated at the Town’s expense and labor. 2. Installation of a new Lochinvar CopperFin2 CPN752 including all transportation, rigging or other installation service required to install the unit, elevated mounting hardware to a minimum of current height, piping, electrical, conduit, venting, and valving. Approximately 100’ of 2” Schedule 80 CPVC removed during demolition shall be replaced including: all piping and hangers. Hayward 2” true-union CPVC ball valves shall be installed within 5’of the main line and within 5’ of the boiler. Valving shall be installed to be easily accessible and provide for full function of the valve handle without modification. Boiler installation shall include manufacturers provided/approved startup and commissioning of the boiler and training of Town staff (up to four hours, as required). All hardware, mounting accessories and methods, and piping shall be designed for wet corrosive environments. Vent piping and pipe hangers shall be of 304 stainless (preferred), aluminum or other anticorrosive material to be approved by the Town. No dissimilar metals shall be in contact with one another without isolation. Installation shall be in accordance with all applicable local, state, and federal codes, and in accordance with all manufacturer’s specifications. Permits and inspections (and any associated fees) shall be the responsibility of the contractor.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents