Similar Projects
Mill, AC Resurfacing, Pipe Work, Modify Intersection, Bridge Rail Upgrade, Inslope Restoration
Infrastructure
Conception
$5,356,000 CJ est. value
Custer, SD 57730

Mill, AC Resurfacing, Pipe Work, Modify Intersection, Bridge Rail Upgrade, Inslope Restoration
Infrastructure
Conception
$5,356,000 CJ est. value
Custer, SD 57730

Replace Str (RCBC), Approach Grading
Infrastructure
Design
$1,852,000 CJ est. value
Custer, SD 57730

Replace Str (RCBC), Approach Grading
Infrastructure
Design
$1,852,000 CJ est. value
Custer, SD 57730

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Bridge Deck Polymer Chip Seal Repair
New Construction, Infrastructure
Results

Underground Infrastructure Inspection
Infrastructure
Post-Bid

North 7th Street Water and Sanitary Sewer Extension
Infrastructure
Results
Custer, SD 57730

Repair NPS Route 5 for Wind Cave NP
Alteration
Post-Bid
Hot Springs, SD 57747

Structure Demolition and Site Restoration
Demolition, Infrastructure
Results
Custer, SD 57730

Airport Pavement Maintenance Project
Infrastructure
Post-Bid

Shared Use Path
Infrastructure
Results
SD

Intersection Improvements
Infrastructure
Post-Bid
SD

Last Updated 01/24/2023 03:10 AM
Project Title

Urban Grading, Curb and Gutter, Storm Sewer, Lighting, PCC Surfacing, Sidewalk, Curb Ramps - US 16

Physical Address View project details and contacts
City, State (County) Custer, SD 57730   (Custer County)
Category(s) Heavy and Highway, Outdoor Lighting, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Roadway Lighting, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected June 2026
Bids Due View project details and contacts
Estimated Value $21,362,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

US16 - Fm 4th St in Custer to N of Buckhorn Lp Length 1.6 As of January 24, 2023, the project is in Conceptual status. Anticipated Construction year is 2026. SDDOT - Urban Grading, Curb and Gutter, Storm Sewer, Lighting, PCC Surfacing, Sidewalk, Curb Ramps - US 16 *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents