Similar Projects
Atari Hotel
New Construction
Conception
$65,000,000 to $75,000,000 est. value
Phoenix, AZ 85003

Atari Hotel
New Construction
Conception
$65,000,000 to $75,000,000 est. value
Phoenix, AZ 85003

Hospice of The Valley Campus
New Construction
Design
Phoenix, AZ 85038

Broadstone Dobson Ranch
New Construction
Design
Mesa, AZ 85202

Springhill Suites at Papago Plaza
New Construction - 72,795 SF
Post-Bid
$5,000,000 to $10,000,000 CJ est. value
Scottsdale, AZ 85257

Small Tenant Improvement
Term Contract
Post-Bid
Mesa, AZ 85211

2017-2018 Downtown Development
Results
Phoenix, AZ

Baden #14 Scattered Site Rehabilation
Results
Less than $7,515 est. value
Tolleson, AZ 85353

CopperWynd Redevelopment - Fountain Hills, AZ
Renovation
Construction
Fountain Hills, AZ 85268

Sonoran Place at Ashton Woods
New Construction - 191,174 SF
Construction
$42,700,000 est. value
Peoria, AZ

Cerro Vista
New Construction
Pending Verification
Avondale, AZ 85018

Goodyear Civic Square Parcel B
New Construction
Pending Verification
Goodyear, AZ 85338

Fit Collective
Build-Out
Conception
Gilbert, AZ 85296

Parkside
New Construction - 794,400 SF
Design
Avondale, AZ 85392

Home2 Suites
New Construction - 110,876 SF
Post-Bid
Phoenix, AZ 85085

Last Updated 04/21/2021 01:06 PM
Project Title

Ritz-Carlton Community

Physical Address View project details and contacts
City, State (County) Paradise Valley, AZ 85253   (Maricopa County)
Category(s) Commercial, Entertainment/Recreation, Residential
Sub-Category(s) Fitness Center, Hotel/Motel, Single-Family Homes
Contracting Method
Project Status Construction Commenced third quarter 2018, Construction Complete as of third quarter 2020
Bids Due View project details and contacts
Estimated Value $1,500,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Mixed Use. Individual Lots to be Sold.

Details

1 Fitness Center, 2,500 SF New Construction, 1 Hotel/Motel, New Construction 225 Unit(s), 123 Acres, Single-Family Homes, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete, Precast Concrete, Precast Structural Concrete, Precast Concrete Slabs, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Plastic Doors, Entrances and Storefronts, Windows, Hardware, Glazing, Mirrors, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Specialty Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Commercial Laundry and Dry Cleaning Equipment, Maintenance Equipment, Residential Equipment, Residential Appliances, Ice Machines, Cleaning and Disposal Equipment, Athletic Equipment, Exercise Equipment.
Division 12 - Furnishings, Window Blinds, Curtains and Drapes, Casework, Furnishings and Accessories, Rugs and Mats, Hospitality Furniture.
Division 13 - Special Construction, Special Activity Rooms, Athletic Rooms.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central Heating Equipment, Central Cooling Equipment, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Medium-Voltage Electrical Distribution, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents