Last Updated 10/25/2021 10:31 AM
Project Title

Construction Manager at Risk Camp Loop Repairs at Cedar Hill State Park

Physical Address View project details and contacts
City, State (County) Cedar Hill, TX 75104   (Dallas County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $13,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1. Describe utility connections at the site (city water vs. well, city wastewater vs. water treatment plant, any lift stations, experience with HDPE pipe 12” and smaller). 2. Describe new construction and/or addition renovation components. 3. Describe project aspects completed in flood hazard areas. Describe methods taken to work in flood areas as well as design/construction measures implemented to protect against future flood events. 4. Describe past experience with shoreline stabilization work, types of methods employed, techniques used. 5. Describe experience with sustainability initiatives and methods or design elements constructed on past projects. 6. Describe experience with TxDOT road standards, past roadway work, new or repair, and type of construction such as asphalt or concrete.

Details

Division 03 - Concrete, Precast Concrete.
Division 26 - Electrical.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents