Similar Projects
Woodward Avenue Road and Utility Improvements
Bidding
Less than $500,000 est. value
Eustis, FL 32726

Shoulder Rework and Culvert Pipe Desilt
Bidding
Less than $1,110,675 est. value
FL

Road Resurfacing and Related Services
Post-Bid
FL

CR 42 Lane Departure Mitigation for Marion County Line to SR 44
Post-Bid
FL

Traffic OPS Improvement
Results
Less than $1,000,000 est. value

Bike Path/Trail/Earthwork
Results
Less than $3,130,502 est. value

Roadway Depression Repair
Bidding
Less than $165,000 est. value
FL

Road, Drainage, and Sidewalk Construction Job Order Contract, Projects
Post-Bid
Less than $200,000 est. value
Tavares, FL 32778

Resurfacing
Results
Less than $3,659,931 est. value
Eustis, Mount Dora, FL 32727

Hilochee WMA Road Capping
Results
Less than $25,726 est. value
FL

Asphalt Repair
Results
Less than $1,107,400 est. value
FL

Swale and Ditch Digging and Related Services
Term Contract
Results
Tavares, FL 32778

Add Lanes and Reconstruct/ Bridge Removal
Results
Less than $46,251,724 est. value
FL

Island Drive Improvement Construction Project
Results
Less than $189,827 est. value
Howey-in-the-Hills, FL 34737

CR 455 and Ridgewood Avenue Roundabout
Results
Less than $988,072 est. value
Montverde, FL 32778

Last Updated 10/07/2020 09:18 AM
Project Title

Hilochee Phase 2 - Structure Replacement

Physical Address View project details and contacts
City, State (County) Clermont, FL 34714   (Lake County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $365,000
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Stabilization of roadway. Installation of culverts, low water crossing and other structural repairs. Pre-Bid Meeting Location: If driving from the North. Go to Clermont and turn South on US HWY 27. Drive South for approximately 10 miles until you reach Riddick Grove Road (on Google) on the right. A subdivision entry (Tradds Landing is to the left). Park in the open field next to the Hilochee sign and the group with caravan to the project site in your own vehicles. If driving from the South. Exit I-4 on to US HWY 27 north. Drive North for approximately 14 miles until you reach Riddick Grove Road (on Google) on the left. A subdivision entry (Tradds Landing is to the right). Park in the open field next to the Hilochee sign and the group with caravan to the project site in your own vehicles.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents