Similar Projects
Last Updated | 10/07/2020 09:18 AM |
Project Title | Hilochee Phase 2 - Structure Replacement |
Physical Address | View project details and contacts |
City, State (County) | Clermont, FL 34714 (Lake County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction, Shoreline/Erosion/Drainage |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $365,000 |
Plans Available from | State Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Stabilization of roadway. Installation of culverts, low water crossing and other structural repairs. Pre-Bid Meeting Location: If driving from the North. Go to Clermont and turn South on US HWY 27. Drive South for approximately 10 miles until you reach Riddick Grove Road (on Google) on the right. A subdivision entry (Tradds Landing is to the left). Park in the open field next to the Hilochee sign and the group with caravan to the project site in your own vehicles. If driving from the South. Exit I-4 on to US HWY 27 north. Drive North for approximately 14 miles until you reach Riddick Grove Road (on Google) on the left. A subdivision entry (Tradds Landing is to the right). Park in the open field next to the Hilochee sign and the group with caravan to the project site in your own vehicles. |
||||||||||
Details |
|
||||||||||
Bidder's List | View project details and contacts | ||||||||||
Prospective Bidders | View project details and contacts | ||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |