Similar Projects
Las Americas Boat & RV Storage
New Construction - 652,134 SF
Conception
$10,000,000 CJ est. value
Eden, UT 84310

Roper Buildings
New Construction
Design
Ogden, UT 84401

Clearfield Flex
New Construction - 162,405 SF
Design
$10,000,000 CJ est. value
Clearfield, UT 84015

Design-Build a Joint Advanced Tactical Missile (JATM) Storage Facility
- 12,000 SF
Post-Bid
$5,000,000 to $10,000,000 est. value
UT

Golden Spike Event Center Pole Barn Structures (3)
Post-Bid
Ogden, UT 84404

District Maintenance Building Project
Results
Less than $395,000 est. value
Ogden, UT 84404

George E. Wahlen Veterans Home Three Storage Additions
Results
Ogden, UT 84404

Cubiscan Expansion
Renovation, Demolition - 5,111 SF
Construction
Farmington, UT 84025

BDO 1017
New Construction - 201,000 SF
Construction
$10,000,000 CJ est. value
Ogden, UT

Dickson Companies Warehouse
New Construction - 48,138 SF
Pending Verification
$5,000,000 to $10,000,000 CJ est. value
North Salt Lake, UT

Hughes Building 1100
New Construction
Pending Verification
North Salt Lake, UT

Mountain View Office & Storage
New Construction
Design
Harrisville, UT 84404

Building 1954, HAFB Museum Warehouse and Equipment Building
New Construction
Post-Bid
Clearfield, UT

Woods Cross WX Warehouses
New Construction - 159,500 SF
Construction
$10,000,000 CJ est. value
Woods Cross, UT 84087

Love Carpet Cleaning
New Construction - 6,108 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
North Salt Lake, UT 84054

Last Updated 04/27/2020 01:06 PM
Project Title

AMXG Aircraft Facilitate Other Maintenance (FOM) for Hill AFB

Physical Address View project details and contacts
City, State (County) Ogden, UT (Davis, Weber Counties)
Category(s) Commercial
Sub-Category(s) Warehouse/Storage
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFP), All Bids Received, Selection Expected May 2020
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor shall receive, issue, inventory, verify FOM parts and material in preparation for storage, and provide a positive control of parts and material - C-130 workload is expected to expand to the Ogden Airport.

Details

Division 01 - General Requirements, Cleaning and Waste Management, Progress Cleaning.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents