Similar Projects
East Miller Road Expansion - City of Republic
Infrastructure
Conception
Less than $1,000,000 est. value
Republic, MO 65738

MM Five Lane Part 3 - City of Republic
Infrastructure
Conception
$4,000,000 est. value
Republic, MO

South Lone Pine Mixed Use
New Construction, Infrastructure - 132,600 SF
Design
$35,000,000 CJ est. value
Springfield, MO 65804

South Lone Pine Mixed Use
New Construction, Infrastructure - 132,600 SF
Design
$35,000,000 CJ est. value
Springfield, MO 65804

Group 6 Public Sewer Rehabilitation - Sewer Main Cleaning, CCTV and Cured-in-Place Pipe (CIPP)
Infrastructure
Bidding
$200,000 CJ est. value
Springfield, MO 65806

Irrigation System Maintenance, Repair, Testing, and New Installation
Infrastructure
Bidding
$280,000 CJ est. value
Springfield, MO 65806

Aquatic Center Parking Lot Asphalt and Curb Maintenance
Infrastructure, Alteration
Post-Bid
Willard, MO 65781

Aquatic Center Parking Lot Asphalt and Curb Maintenance
Infrastructure, Alteration
Post-Bid
Willard, MO 65781

Arterial Street ADA Ramp
Infrastructure
Results
Springfield, MO

Kansas Expressway Extension Phase I
Infrastructure
Results
Springfield, MO

Element By Westin - Marriott / Springfield
New Construction, Infrastructure - 71,477 SF
Construction
$22,000,000 CJ est. value
Springfield, MO 65807

Buc-ee's / Springfield
New Construction, Infrastructure - 53,000 SF
Construction
$28,000,000 CJ est. value
Springfield, MO 65803

Simply Smart Self-Storage Facility
New Construction, Infrastructure - 55,500 SF
Pending Verification
$6,000,000 CJ est. value
Republic, MO 65619

OZMOD 425
Demolition, New Construction, Infrastructure - 37,533 SF
Pending Verification
$10,500,000 CJ est. value
Springfield, MO 65803

MM Five Lane Part 2 - City of Republic
Infrastructure
Conception
$3,200,000 est. value
Republic, MO

Last Updated 05/02/2023 11:35 AM
Project Title

Battlefield Corridor Improvements - Lone Pine to Luster

Physical Address View project details and contacts
City, State (County) Springfield, MO 65807   (Greene County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $10,700,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of roadway improvements along Battlefield Road from a location near the Battlefield - Lone Pine Intersection to a location west of the Battlefield-Luster Intersection. There is concrete pavement replacement in sections, intersection improvements at Luster and Lone Pine. There are ADA and sidewalk improvements which include building sidewalk and a multi-purpose trail between the Galloway Greenway Trail and Lone Pine. For further bidding information, contact Nicholas Edelman, City of Springfield, Public Works, at 417-864-1932. A certified or cashiers check or bid bond in the amount of 5 percent of the bid shall be submitted with each proposal. The City reserves the right to reject any and all bids to waive irregularities in bids. The City is committed to providing opportunities to DBE, MBE, and WBE prime, general, and subcontractors and encourages such business enterprises to submit responses.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents