Similar Projects
SR 0522 over Jacks Creek
Infrastructure
Conception
$2,300,290 CJ est. value
Mc Clure, PA 17841

SR 0522 over Jacks Creek
Infrastructure
Conception
$2,300,290 CJ est. value
Mc Clure, PA 17841

SR 2007 over Tributary to Middle Creek
Demolition, New Construction, Infrastructure
Design
$380,000 CJ est. value
Mount Pleasant Mills, PA 17853

SR 2007 over Tributary to Middle Creek
Demolition, New Construction, Infrastructure
Design
$380,000 CJ est. value
Mount Pleasant Mills, PA 17853

Culvert Replacement
Infrastructure
Bidding
$200,000 CJ est. value
McClure, PA 17841

23 WHM SGL 211 Railroad Grade Road Phase 1
Infrastructure
Post-Bid

Paving
Infrastructure
Post-Bid
Beaver Springs, PA

Scratch and Wearing Course
Infrastructure
Results
Beaver Springs, PA

Plum Street Improvements Phase 7
Infrastructure
Results
$50,000 est. value

Susquehanna Commons
New Construction, Infrastructure
Pending Verification
$13,000,000 CJ est. value
Selinsgrove, PA 17870

Susquehanna Commons
New Construction, Infrastructure
Pending Verification
$13,000,000 CJ est. value
Selinsgrove, PA 17870

Dinius Ave to Water Tower Road
Infrastructure
Conception
$360,000 CJ est. value
Middleburg, PA 17842

SR 522 over Tb Middle Crk
Demolition, New Construction, Infrastructure
Design
$3,525,000 CJ est. value
Middleburg, PA 17842

Asphalt Paving At 8 LNA Sites
Term Contract
Post-Bid

SR 2006 Over Tributary to Mahantango Creek
New Construction, Infrastructure
Results
$200,000 to $499,999 est. value
PA

Last Updated 01/23/2023 03:32 AM
Project Title

SR 4012 over Kreb Gap Run

Physical Address View project details and contacts
City, State (County) Mc Clure, PA 17841   (Snyder County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected October 2029
Bids Due View project details and contacts
Estimated Value $330,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

SR 4012 over Kreb Gap Run, Spring (Twp) BMS# 54401200500000 As of January 23, 2023, the project is in future development stage. Anticipated letting date is September 01, 2029. PennDOT - SR 4012 over Kreb Gap Run *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents