Similar Projects
Water, Sewer and Drainage Replacement and Emergency Repairs
Post-Bid
Less than $200,000 est. value
Melrose, MA

HDPE Plastic Pipeline to be Used for Discharge of Hydraulically Dredge Material
Post-Bid
Barnstable, MA

Forest River Park Seawall Repair Project
Results
Less than $3,050,000 est. value
Salem, MA

Sallies Cradle Slope and Culvert Improvements and Related Work
Results
$420,000 est. value
Mount Washington, MA

Rail-South Coast Rail Early Action Culverts
Post-Bid
Fall River, Middleborough, New Bedford, MA

Culvert Replacement - Lincoln Street Bridge Over Fox Brook
Results
Less than $500,000 est. value
Blackstone, MA

On-Call Services to Repair and/or Replace Water, Sewer and Drain Infrastructure
Term Contract
Post-Bid
Less than $1,200,000 est. value
Lowell, MA

Stormwater Drainage Improvements and Related Work at Various Locations
Results
Less than $100,787,577 est. value
Ayer, Lancaster, Leominster, Natick, Worcester, MA

Removal and Replacement of 46 Existing Culverts
Post-Bid
Less than $17,400,000 est. value

Repair of Existing Retaining Wall for Deerfield Street
Results
$85,000 est. value
Greenfield, MA

First Level Canal Wall Repairs - Cabot Street
Post-Bid
Holyoke, MA

Scheduled and Emergency Catch Basin and Drainage System Cleaning at Various Locations in Areas A, B, C and D (Excluding Martha's Vineyard and Nantucket Island)
Results
Less than $1,050,000 est. value

Construction of Two Bioretention Basins
Post-Bid
Less than $70,000 est. value
Milton, MA

Mills Avenue - Erosion Repair
Results
$40,000 est. value
Revere, MA

Management and Operation of the Mirror Lake Recreational Facility
Term Contract
Post-Bid
Devens, MA

Last Updated 11/28/2018 01:17 PM
Project Title

Drainage Improvements

Physical Address View project details and contacts
City, State (County) Tisbury, MA   (Dukes County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $342,000
Plans Available from Copy Center - 10/10/18
Owner View project details and contacts
Architect View project details and contacts
Description The project consists of drainage improvements along Center Street between Main Street and Franklin Street. The work includes furnishing and installing of approximately 1,100 feet of 12-inch and 15-inch reinforced concrete pipe including manholes, catch basins, temporary and permanent pavement patching and all necessary incidental appurtenances to complete the installation.
Details
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents