Similar Projects
Roughly 40,000 Square Yard Asphalt Paving Project
Bidding
$900,000 est. value
Pittsfield, MA

Annual Streetscape Maintenance
Post-Bid
Less than $25,000 est. value
Pittsfield, MA

Streetscape Maintenance for Three Years
Post-Bid
Less than $90,000 est. value
Pittsfield, MA

Full Depth Reclamation - Frd Crooked Hill Road
Results
Alford, MA 01230

HMA Paving
Results
Less than $175,000 est. value
Alford, MA 012308

SAMI (Asphalt-Rubber Surface Treatment)
Post-Bid
Mill River, MA 01244

Resurfacing and Related Work on the Ashuwillticook Rail Trail
Results
Less than $4,367,000 est. value
Adams, Cheshire, Lanesborough, MA 01220

Statewide Airport Pavement Maintenance Project
Post-Bid
Less than $1,500,000 est. value

Resurfacing and Related Work along a Section of Route 7 (New Ashford Road)
Results
Less than $3,007,000 est. value
New Ashford, MA 01237

Statewide Pavement Maintenance and Pavement Markings at Various Public-Use Airports
Post-Bid
Less than $1,500,000 est. value
Wakefield, MA

Maple Street Paving
Results
$340,000 est. value
Lee, MA 01238

Yokum Pond FDR and HMA
Post-Bid
Less than $365,000 est. value
Becket, MA 01223

Resurfacing and Related Work along a Section of Interstate 90 Westbound
Results
Less than $8,466,187 est. value

2020 West Center Road Paving
Post-Bid
Less than $560,000 est. value
West Stockbridge, MA

East and West Street Paving FY 2020 Mount Washington Road Improvements
Results
Less than $389,012 est. value
Mount Washington, MA 01258

Last Updated 07/01/2020 09:23 AM
Project Title

Resurfacing and Related Work on a Section of Route 2 (Mohawk Trail)

Physical Address View project details and contacts
City, State (County) Florida, Savoy, MA 01247   (Berkshire County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $5,312,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

"1.000","Ls","Schedule Of Operations - Fixed Price $40500","100." "1.000","a","Clearing And Grubbing","101." "400.000","Ft","Tree Trimming","102.1" "630.000","Cy","Earth Excavation","120." "1.000","Cy","Class a Rock Excavation","121." "2575.000","Cy","Class a Trench Excavation","141." "20.000","Cy","Test Pit For Exploration","141.1" "5.000","Cy","Class b Trench Excavation","142." "265.000","Cy","Class b Rock Excavation","144." "1100.000","Cy","Gravel Borrow - Type c","151.01" "100.000","Ton","Crushed Stone","156." "1060.000","Sy","Fine Grading And Compacting - Subgrade Area","170." "1.000","Ls","Environmental Health And Safety Program","180.01" "40.000","Hr","Personal Protection Level c Upgrade","180.02" "40.000","Hr","Licensed Site Professional Services","180.03" "30.000","Ton","Disposal Of Unregulated Soil","181.11" "15.000","Ton","Disposal Of Regulated Soil - In-State Facility","181.12" "1.000","Ton","Disposal Of Regulated Soil - Out-Of-State Facility","181.13" "1.000","Ton","Disposal Of Hazardous Waste","181.14" "30.000","Ton","Disposal Of Treated Wood Products","184.1" "20.000","Ea","Di Precast Concrete Throat","209.51" "10.000","Ea","Drop Inlet Rebuilt","209.52" "14.000","Ea","Drainage Structure Adjusted","220." "3.000","Ft","Sanitary Structure Rebuilt","220.6" "2.000","Ea","Sanitary Structure Adjusted","220.7" "2.000","Ea","Frame And Cover - Secured","221.1" "4.000","Ea","Frame And Grate - Massdot Cascade Type","222.1" "6.000","Ea","Frame And Grate (Or Cover) Removed And Discarded","223.2" "2.000","Cy","Removal Of Drainage Structure Sediment","227.3" "80.000","Ft","Removal Of Drainage Pipe Sediment","227.31" "30.000","Ft","12 Inch Drainage Pipe - Option","234.12" "2.000","Ea","12 Inch Drainage Pipe Flared End - Option","235.12" "30.000","Sy","Stone For Pipe Ends","258." "7400.000","Sy","Hot Mix Asphalt Waterway","280." "136.000","Ton","Hot Mix Asphalt Waterway","280.1" "10.000","Sy","Dumped Stone Lining (Waterways)","281.5" "530.000","Cy","Dense Graded Crushed Stone For Sub-Base","402." "15100.000","Ft","Pavement Milling Mulch For Shoulders","402.13" "99300.000","Sy","Pavement Micromilling","415." "14010.000","Ton","Superpave Surface Course - 12.5 Polymer (Ssc - 12.5 - p)","450.231" "180.000","Ton","Superpave Intermediate Course - 12.5 Polymer (Sic -12.5 - p)","450.311" "360.000","Ton","Superpave Base Course - 25.0 (Sbc - 25.0)","450.41" "700.000","Ton","Hma For Patching","451." "7445.000","Gal","Asphalt Emulsion For Tack Coat","452." "85600.000","Ft","Hma Joint Sealant","453." "50.000","Ton","Asphalt Mixtures For Temporary Work","472." "21200.000","Ft","Milled Centerline Sinusoidal Rumble Strip","477.07" "1.000","Ea","Granite Curb Inlet - Straight","514." "8100.000","Ft","Hot Mix Asphalt Curb Type 2","570.2" "4.000","Ea","Curb Inlet Removed And Reset","581." "1.000","Ea","Curb Inlet Removed And Discarded","595." "12250.000","Ft","Guardrail, Tl-3 (Single Faced)","620.13" "100.000","Ft","Guardrail - Curved, Tl-3 (Single Faced)","620.33" "23.000","Ea","Trailing Anchorage","627.1" "24.000","Ea","Guardrail Tangent End Treatment, Tl-3","627.83" "10.000","Ea","Guardrail Flared End Treatment, Tl-3","627.93" "4.000","Ea","Transition To Nchrp 350 Guardrail","628.21" "4.000","Ea","Transition To Bridge Rail","628.24" "2.000","Ea","Transition To Thrie Beam","628.25" "11640.000","Ft","Highway Guard Removed And Discarded","630.2" "175.000","Ft","Chain Link Fence Removed And Reset","666." "200.000","Sy","Geotextile Fabric For Separation","698.3" "210.000","Ton","Hot Mix Asphalt Driveway","703." "12.000","Mo","Engineers Field Office And Equipment (Type a)","740." "1.000","Ls","Mobilization","748." "1010.000","Cy","Loam Borrow","751." "4690.000","Sy","Seeding","765." "30850.000","Ft","Sediment Control Barrier","767.121" "4690.000","Sy","Straw Mulch","767.31" "180.000","Sy","Composted Mulch For Modified Rockfill","767.77" "26785.000","Ft","Pavement Milling Mulch Under Guard Rail","769." "14235.000","Ft","Thrie Beam Berm Treatment","769.50" "135.000","Ea","Demountable Reflectorized Delineator - Guard Rail","833.5" "60.000","Ea","Delineation For Guard Rail Termini","833.7" "220.000","Hr","Roadway Flagger","850.41" "200.000","Day","Traffic Cones For Traffic Management","851.1" "510.000","Sf","Safety Signing For Traffic Management","852." "200.000","Day","Truck Mounted Attenuator","853.403" "56620.000","Ft","Temporary Paving Markings - 6 Inch (Painted)","854.016" "2850.000","Ft","Temporary Paving Markings - 6 Inch (Tape)","854.036" "200.000","Day","Arrow Board","856." "400.000","Day","Portable Changeable Message Sign","856.12" "10000.000","Day","Reflectorized Drum","859." "300.000","Ea","Slotted Pavement Marker One-Way Yellow","864.32" "1250.000","Ea","Slotted Pavement Marker Two-Way Yellow/Yellow","864.35" "59360.000","Ft","6 Inch Durable Wet Reflective Recessed White Line (Polyurea)","868.206" "180.000","Ft","12 Inch Durable Wet Reflective Recessed Yellow Line (Polyurea)","868.212" "52210.000","Ft","6 Inch Durable Wet Reflective Recessed Yellow Line (Polyurea)","869.206" "5.000","Ea","Traffic Sign Removed And Reset","874.2" "120.000","Cy","Modified Rockfill Removed And Relaid","983.31" "20.000","Ton","Modified Rockfill","986."

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents