Similar Projects
Towne Mall Galleria / Middletown Multi-Purpose Entertainment Venue
New Construction
Design
$280,000,000 est. value
Middletown, OH 45005

Southwest Regional Water District Metcalf Plant #1 Well Rehabilitation
Infrastructure
Bidding
$60,000 CJ est. value
Hamilton, OH 45013

Brittany Heights Concrete Rehabilitation
Infrastructure
Bidding
$400,000 CJ est. value
Monroe, OH 45044

Jacking and Boring Services
Infrastructure
Post-Bid

Box Culverts
Infrastructure
Post-Bid

ADS, Hancor, Haviland and Baughman Name Brand Plastic Tubing, Pipe and Fittings
Results

Sludge Pond Grading
Infrastructure
Results
Middletown, OH 45044

Seward Pointe Commerce Park
New Construction, Infrastructure - 445,000 SF
Pending Verification
$45,000,000 CJ est. value
Fairfield, OH 45011

Concrete Pipes
Infrastructure
Post-Bid

Equestrian Center Erosion Control Four Mile Creek Restoration
Alteration
Results
$210,000 est. value
Oxford, OH 45056

Precast Catch Basins, Risers, and Grates
Infrastructure
Post-Bid

Fairfax Avenue Drainage
Infrastructure
Results
$273,231 est. value
Lindenwald, OH 45015

Concrete Pipes
Infrastructure
Post-Bid

Starlight Estates Culvert Extension
Infrastructure
Results
$163,585 est. value
Fairfield, OH

Old Manse Drainage and Engineering 2022
Infrastructure
Post-Bid
$338,000 est. value
Oxford, OH

Last Updated 07/28/2022 12:57 AM
Project Title

Elk Creek Restoration Project

Physical Address View project details and contacts
City, State (County) Trenton, OH 45067   (Butler County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids.
Project Status Results,
Bids Due View project details and contacts
Estimated Value $417,855 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of Work to Be Performed Under This Improvement Shall Generally Consist of Reconstructing and Protecting Approximately 650 Feet of Eroded Bank of the Elk Creek Near the Northern Boundary of Trenton Community Park. The Scope of Work Includes Removing Existing Gravel Deposits, Placing Embankment and Reconstructing the West Bank, and Installing Rock Protection on the Reconstructed Bank and Rock Vanes in Elk Creek. The Bank Will Also Be Stabilized and Landscaped. Each Bidder Is Required to Furnish With Its Proposal, a Bid Guaranty (10% of the Bid Amount) and Contract Bond (100% of the Bid Amount) in Accordance With Section 153.54 of the Ohio Revised Code. Bid Security Furnished in Bond Form, Shall Be Issued by a Surety Company or Corporation Licensed in the State of Ohio to Provide Said Surety. Each Bid Proposal Must Contain the Full Name of the Party or Parties Submitting the Proposal and All Persons Interested Therein. Each Bidder Must Submit Evidence of Its Experiences on Projects of Similar Size and Complexity. Bidders Must Comply With the Prevailing Wage Rates on Public Improvements in Butler County and the City of Trenton as Determined by the Ohio The Above Improvement Shall Be in Accordance With the Contract Documents. The City of Trenton Reserves the Right to Reject Any or All Bids in Accordance With the Contract Documents. The City of Trenton Reserves the Right to Add to or to Subtract From the Contract Quantities. The City of Trenton Also Reserves the Right to Hold All Proposals for Sixty (60) Days. Bureau of Employment Services, Wage and Hour Division, (614) 644-2239.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents